mcpField
A
actualize

actualize

github.com/neolabhqDevelopment1.8k1.2k installsUpdated 9w ago
Repository

About actualize

actualize is a command for keeping an FPF knowledge base aligned with a project's changing codebase. It reviews Git changes to identify context drift, stale evidence, and potentially outdated decisions.

Key features

  1. 01Compares Git changes with a saved baseline
  2. 02Checks project context for drift
  3. 03Flags evidence tied to changed files
  4. 04Identifies decisions that may be outdated
  5. 05Updates the actualization baseline

Use cases

  1. 01Refresh project context after configuration changes
  2. 02Review evidence after code changes
  3. 03Check decision records before making decisions
  4. 04Run recurring knowledge-base maintenance

Install

Copy the command and run it in a terminal.

$npx skills add https://github.com/neolabhq/context-engineering-kit --skill actualize

After installing, type/actualizein Claude Code to confirm it loaded.

Details

From the project README

Actualize Knowledge Base

This command is a core part of maintaining a living assurance case. It keeps your FPF knowledge base (.fpf/) in sync with the evolving reality of your project's codebase.

The command performs a three-part audit against recent git changes to surface potential context drift, stale evidence, and outdated decisions. This aligns with the Observe phase of the FPF Canonical Evolution Loop (B.4) and helps manage Epistemic Debt (B.3.4).

Action (Run-Time)

Step 1: Check Git Changes

Run git commands to identify changes since last actualization:

# Get current commit hash
git rev-parse HEAD

# Check for changes since last known baseline
# (Read .fpf/.baseline file if it exists, otherwise use initial commit)
git diff --name-only <baseline_commit> HEAD

# List all changed files
git diff --stat <baseline_commit> HEAD
Step 2: Analyze Report for Context Drift
  1. Review changed files for core project configuration:

    • package.json, go.mod, Cargo.toml, requirements.txt
    • Dockerfile, docker-compose.yml
    • .env.example, config files
  2. If configuration files changed:

    • Re-read project structure (README, config files)
    • Compare detected context with .fpf/context.md
    • Present diff to user
  3. Ask user if they want to update context.md

Step 3: Analyze Report for Evidence Staleness (Epistemic Debt)
  1. Read all evidence files in .fpf/evidence/
  2. Check carrier_ref field in each evidence file
  3. Cross-reference with changed files from git diff
  4. If a referenced file changed:
    • Flag the evidence as STALE
    • Note which hypothesis is affected
Step 4: Analyze Report for Decision Relevance
  1. Read all DRR files in .fpf/decisions/
  2. Trace back to source evidence and hypothesis files
  3. If foundational files changed:
    • Flag the DRR as POTENTIALLY OUTDATED
Step 5: Update Baseline

Create/update .fpf/.baseline file:

# FPF Actualization Baseline
# Last actualized: 2025-01-15T16:00:00Z
commit: abc123def456
Step 6: Present Findings

Output a structured report:

## Actualization Report

**Baseline**: abc123 (2025-01-10)
**Current**: def456 (2025-01-15)
**Files Changed**: 42

### Context Drift

The following configuration files have changed:
- package.json (+5 dependencies)
- Dockerfile (base image updated)

**Action Required**: Review and update `.fpf/context.md` if constraints have changed.

### Stale Evidence (3 items)

| Evidence | Hypothesis | Changed File |
|----------|------------|--------------|
| ev-benchmark-api | api-optimization | src/api/handler.ts |
| ev-test-auth | auth-module | src/auth/login.ts |
| ev-perf-db | db-indexing | migrations/002.sql |

**Action Required**: Re-validate to refresh evidence for affected hypotheses.

### Decisions to Review (1 item)

| DRR | Affected By |
|-----|-------------|
| DRR-2025-01-10-api-design | src/api/handler.ts changed |

**Action Required**: Consider re-evaluating decision via `/fpf:propose-hypotheses`.

### Summary

- Context drift detected: YES
- Stale evidence: 3 items
- Decisions to review: 1 item

Run `/fpf:decay` for detailed freshness management.

File: .fpf/.baseline

Track the last actualization point:

# FPF Actualization Baseline
last_actualized: 2025-01-15T16:00:00Z
commit: abc123def456789
branch: main

When to Run

  • Before starting new work: Ensure knowledge base is current
  • After major changes: Sync evidence with code changes
  • Weekly maintenance: Part of regular hygiene
  • Before decisions: Ensure evidence is still valid

Comments

Markdown supported