align-planning is an agent skill for checking whether completed work still matches project goals, requirements, milestones, and roadmap. It classifies planning drift, assesses evidence quality, and produces a prioritized recalibration report.

Key features

  1. 01Trace work across planning layers
  2. 02Classify four types of planning drift
  3. 03Assess evidence readiness and confidence
  4. 04Recommend prioritized recalibration actions
  5. 05Persist a structured alignment report

Use cases

  1. 01Reviewing alignment after a task is completed
  2. 02Checking planning drift before closing a milestone
  3. 03Assessing scope changes ahead of a release
  4. 04Reordering backlog items using evidence

Install

Copy the command and run it in a terminal.

$npx skills add https://github.com/nesnilnehc/ai-cortex --skill align-planning

After installing, type/align-planningin Claude Code to confirm it loaded.

Bundled filesREADME.mdagent.yaml

Details

From the project README

#技能(Skill):协调规划

目的 (Purpose)

通过运行任务后调整循环,使项目执行与更高级别的规划保持一致:从已完成的工作回溯到策略、检测偏差并生成自上而下的重新校准建议。


核心目标(Core Objective)

首要目标:任务完成后生成一份可操作的规划调整报告,其中包含明确的偏差分类和优先的重新校准行动。

成功标准(必须满足所有要求):

  1. ✅ 追踪已完成:通过所选模式的适用项目层追踪已完成的任务
  2. ✅ 漂移分类:所有检测到的偏差都使用规划漂移模型(目标、要求、路线图、优先级),每个项目都有影响范围和根本原因
  3. ✅ 生成校准:提供自上而下的重新校准建议列表,包括后续任务
  4. ✅ 报告持久化:规划对齐报告写入商定的路径
  5. ✅ 评估证据准备情况:对缺失或薄弱的文档进行明确评分并反映在置信度中
  6. ✅ 避免不安全写入:如果映射不确定或更新具有破坏性,则在提出文件级更改之前请求用户确认

验收测试:队友能否阅读报告并立即了解计划是否仍与执行保持一致、存在哪些偏差、下一步做什么以及为什么?


范围边界(范围边界)

本技能负责:

  • 任务后调整评估
  • 跨项目层的自下而上追溯
  • 漂移检测、影响分析和根本原因标记
  • 自上而下的重新校准建议
  • 带有优先级提示的下一个任务建议
  • 规划文档不完整时的证据准备评估和优雅降级

本技能不负责:

  • 从头开始重写需求(使用“分析需求”)
  • 重新设计架构(使用“设计解决方案”)
  • 架构与代码合规性(使用“align-architecture”)
  • 从头开始创建新的路线图或里程碑系统
  • 实施代码更改
  • 团队回顾促进(“哪些进展顺利/哪些进展不佳”)

转交点:报告制作和审核后,按问题类型(需求、架构设计、规划、架构合规性或修复循环)移交给相关技能。


使用场景(用例)

  • 任务后检查点:在完成任何任务后验证对齐情况
  • 里程碑关闭审查:在标记里程碑完成之前运行完全对齐
  • 发布准备:在发布削减之前检测计划偏差
  • 范围转移诊断:调查最近的工作是否仍然支持当前目标
  • 待办事项重新排序输入:生成有证据支持的下一个任务排序信号

编排指导

场景推荐顺序
日常任务完成align-planning(轻量级)
里程碑或释放门align-planning(完整)→ 然后align-architecture
规划漂移疑似对齐规划
需要设计与代码合规性align-architecture (当规划也有问题时,在 align-planning 之后运行)

当规划层对齐不确定时,先运行“align-planning”;在计划架构与代码验证的对齐之后运行“align-architecture”。


行为(行为)

第 0 阶段:Norms Resolution(v1.4 新增)

按 specs/artifact-contract.md §8 Runtime Norms Resolution Protocol 的 §8.2 / §8.3 / §8.5 实现:读项目规范若声明了 planning-alignment artifact_type 的 path_pattern,则使用项目值;否则 fall through 到技能默认(docs/calibration/planning-alignment.md)。本技能为固定路径治理产出,只用 path_pattern 覆盖机制。

代理即时合同

在执行开始时,遵循以下指令合同:

You are responsible for planning alignment.

When a task is completed, perform traceback analysis to ensure planning
(goals, requirements, milestones, roadmap) is aligned with execution,
and produce a structured Planning Alignment Report.
交互(互动)政策
  • 默认:来自上下文的模式(轻量级,除非发布/里程碑/史诗);工作区中的文档根目录
  • 选择选项:当用户喜欢时模式覆盖“[轻量级][完整]”
  • 确认:在文件级更改建议之前;当映射不确定时继续之前 (NeedsMappingConfirmation)
第 0 阶段:模式和上下文解析
  1. 具有确定性策略的解决模式:
    • 如果用户明确设置模式,则使用它
    • 否则,如果上下文包含“release”、“里程碑关闭”或“epic-done”,则使用 完全对齐模式
    • 否则使用轻量级模式 2.解析文档路径:
    • 默认映射采用项目-文档-模板布局
    • 如果提供,应用用户路径映射覆盖
    • 可选发现:如果用户未提供路径映射且默认布局不匹配,请运行文档结构发现(例如在存储库根目录扫描docs/、docs/需求/、docs/路线图*、*.md)或建议discover-docs-norms来建立路径;报告假定的映射,如果不明确则要求确认
  2. 确认最低限度的上下文:
    • 已完成任务总结
    • 至少一个追踪锚点(需求 ID、路线图项、里程碑参考或同等内容)
阶段 0.5:证据准备情况评估

在回溯之前评估证据质量:

  • 强:所选模式下所有必需的图层都存在规范文档
  • 弱:存在部分文档,但至少一个必需的层依赖于辅助证据(问题/PR/提交说明)
  • 缺失:关键层不可用;回溯无法产生可靠的漂移类型

规则:

  1. 丢失的文档不得默默地通过对齐。
  2. 仅当规范文档缺失时才使用辅助证据,并明确标记。 3.结论的置信度必须根据准备程度进行调整:
    • 强 -> 高置信度
    • 弱 -> 中等置信度
    • 失踪 -> 低信心或被阻止
模式定义
  • 轻量级模式:任务积压→路线图→要求
  • 完全对齐模式:任务积压→路线图→里程碑→要求→项目目标

该技能仅涵盖规划层。架构与代码合规性由“align-architecture”处理。

第 1 阶段:回溯(自下而上)
  1. 确定已完成的任务意图、输出和目标结果
  2. 向上遍历选定的层并记录每层的对齐状态:
    • 对齐 | 部分 | 错位 | 未知
  3. 获取每种状态的支持证据
  4. 如果缺少关键映射,请输入“NeedsMappingConfirmation”:
    • 列出缺失的链接
    • 提供 1-3 个候选映射并说明理由
    • 在继续之前请求用户确认
    • 如果未解决,则输出具有所需最少输入的阻止报告
  5. 如果准备情况为“弱”或“缺失”,请注释每层证据来源:
    • canonical(项目文档)
    • 次要(问题/PR/提交上下文)
    • 无
第 2 阶段:漂移检测

将每个漂移项分类为(仅限规划层):

  • 目标漂移:工作不再支持当前的项目目标
  • 需求漂移:需求已更改、已弃用或已被取代
  • 路线图漂移:排序或路线图假设发生变化
  • 优先级漂移:相对于当前业务方向,优先级已经过时

对于实现与设计的偏差,请交给“align-architecture”。

对于每个项目,输出:

  • 类型
  • 影响范围 -“根本原因” -“严重性”(“低”|“中”|“高”)
第 3 阶段:校准(自上而下)

1.从顶层向下重新推导优先级(目标→要求→里程碑→路线图→待办事项) 2. 产生重新校准动作:

  • 优先级调整
  • 顺序变化
  • 依赖性修正
  • 转交后续分析
  1. 推荐接下来的任务,并给出理由和紧急程度
  2. 如果建议对规范规划文档进行编辑,请在生成文件级变更建议之前请求明确确认
第 4 阶段:坚持报告

将报告写至:

  • 从项目规范解析的路径(docs/ARTIFACT_NORMS.md 或 .ai-cortex/artifact-norms.yaml)
  • 默认:docs/calibration/planning-alignment.md(除非明确请求快照,否则覆盖)
  • 或者用户指定的路径

除了人类可读的部分之外,报告还必须包含机器可读的漂移块(YAML 或 JSON)。 报告还必须包括证据准备块和明确的置信度。


输入与输出 (Input & Output)

输入(输入)
  • 完成的任务描述和结果
  • 可选模式覆盖(“轻量级”|“完整”)
  • 可选的文档根/路径映射
  • 可选上下文:发布/里程碑/史诗标记
输出(输出)
规划调整报告模板
# Planning Alignment Report: <task title>

**Date:** YYYY-MM-DD
**Mode:** Lightweight | Full
**Status:** aligned | partial | misaligned | blocked
**Confidence:** high | medium | low

## Completed Task
- Summary:
- Outcome:

## Traceback Path
Task Backlog -> Roadmap -> Milestones -> Requirements -> Project Goals

## Evidence Readiness
- Readiness: strong | weak | missing
- Missing Layers:
- Secondary Sources Used:

## Alignment Status
- Goal Alignment:
- Requirement Alignment:
- Milestone Alignment:
- Roadmap Alignment:

## Drift Detected
- Type:
  Impact Scope:
  Root Cause:
  Severity:

## Impact Analysis
- Delivery impact:
- Technical impact:
- Planning impact:

## Calibration Suggestions
1.
2.
3.

## Recommended Next Tasks
1.
2.
3.

## Machine-Readable Drift

    drifts:
      - driftType: "Requirement Drift"
        severity: "medium"
        owner: "product-team"
        dueWindow: "next-sprint"
        impactScope: "Search filter acceptance criteria"
        rootCause: "Requirement updated to include keyboard navigation; task covered only click interactions"
    evidence:
      readiness: "weak"
      confidence: "medium"
      missingLayers:
        - "docs/requirements-planning/search-improvements.md"
      secondarySources:
        - "PR#142"
        - "commit:abc1234"


限制(限制)

硬边界(Hard Boundaries)
  • 当证据缺失时,不要发明可追溯性链接
  • 当准备状态“薄弱”或“缺失”时,请勿声称高度自信
  • 未经用户明确批准,请勿悄悄修改规划真实来源(目标、需求、里程碑、路线图)
  • 不要将漂移类别折叠到通用的“错位”桶中;保留输入的漂移输出(目标、要求、路线图、优先级)
  • 不要在完整模式下跳过图层检查,除非该图层确实不可用(标记为“未知”并解释)
  • 如果没有与追溯证据相关的理由,请勿提出建议
技能边界 (Skill Boundaries)(避免重叠)

不要做这些(其他技能可以处理它们):

  • 需求重新定义工作流程→分析需求
  • 架构选项设计工作流程→设计解决方案
  • 存储库级入门 → review-codebase、generate-standard-readme、generate-agent-entry (根据需要按顺序运行)
  • 自动测试和修复循环执行 → run-repair-loop

何时停止并交接:

  • 要求无效或矛盾 → 移交给“分析需求”
  • 架构设计冲突是主要障碍→移交给“设计解决方案”
  • 需要进行架构与代码合规性检查 → 移交给“align-architecture”
  • 报告表明需要修复的主动实施缺陷 → 建议“运行修复循环”

自检(Self-Check)

核心成功标准(必须满足所有标准)
  • 所选模式的回溯已完成
  • 使用四类规划模型键入的漂移项目
  • 每个漂移都有影响范围和根本原因
  • 提供自上而下的校准操作
  • 报告坚持约定的路径
  • 明确报告证据准备水平和置信度
  • 在映射或写入安全不确定的情况下请求确认
流程质量检查
  • 模式选择遵循确定性策略
  • 映射不确定性触发了“NeedsMappingConfirmation”
  • 规范证据与次要证据明显分开
  • 每个对齐状态都有证据参考
  • 建议具有优先顺序且有时限
  • 需要时可以明确地移交相邻技能
验收测试

团队成员是否可以在不进行额外说明的情况下执行最重要的 1-3 个建议,并解释为什么它们具有最高优先级?

如果否:报告不完整;完善追溯证据和重新校准细节。

如果是:报告完成;继续进行转交或执行计划。


示例(示例)

示例1:轻量级模式(常规任务)

上下文:已完成的任务更新搜索过滤器 UI 行为。

模式分辨率:没有显式覆盖,没有发布/里程碑/史诗标记 → 轻量级。

回溯:

  • 任务与路线图项目“search-improvements-q2”一致
  • 要求仍然有效,但接受标准上周发生了变化
  • 证据准备度“强”,因为要求和路线图文档都是规范且最新的

漂移:

-“需求漂移”(中):需求措辞更改为包括键盘导航;已完成的任务仅涵盖点击交互

校准:

1.添加键盘导航后续任务 2. 在合并相关 UI 任务之前移动可访问性验收检查 3. 重新排序待办项目以解锁回归测试

示例 2:完整模式(里程碑关闭)

上下文:API 网关身份验证推出后标记为“里程碑关闭”的里程碑。

模式分辨率:标记命中 → 完全。

回溯:

  • 路线图和里程碑映射有效
  • 目标和需求仍然有效
  • 证据准备度“强”;所有规划层都存在规范文档

漂移:

  • 优先级漂移(高):待办中未促进迁移工作

校准:

  1. 将迁移史诗插入当前的冲刺计划中
  2. 推迟非关键网关增强功能
  3. 建议运行 align-architecture 进行架构与代码合规性检查
示例 3:边缘情况(阻塞映射)

上下文:已完成的任务没有要求 ID 或路线图链接。

行为:

  1. 输入“NeedsMappingConfirmation”
  2. 提供带有置信度注释的候选映射
  3. 在漂移分类之前要求用户确认映射

结果:

  • 如果用户确认:继续正常流程
  • 如果未确认:输出带有缺失字段清单的“阻止”报告
  • 在建立规范映射之前,置信度保持“低”

附录:输出合约 (Appendix: Output Contract)

本技能产出 Planning Alignment Report,机器可读片段须满足下表结构:

元素格式必填字段路径模式
报告主体Markdownfront-matter(artifact_type/created_by/lifecycle);章节:摘要 / 任务回溯链 / 漂移项 / 重新校准建议docs/calibration/planning-alignment.md(默认;如需快照另起 -snapshot 副本)
漂移条目列表项id / drift_type(goal_decoupled / requirement_orphan / roadmap_stale / task_unanchored)/ artifact_path / evidence / suggested_fix报告正文「漂移项」节
证据准备度标量readiness / confidence / scanned_artifacts / missing_artifacts报告正文「摘要」节
机器可读块YAML fenced yaml drifts:drifts[] 每项含 id/drift_type/severity/artifact_path/fix_kind;evidence_readiness 顶层字段报告正文末尾,供 plan-next 消费