About collaborative-delivery
Collaborative Delivery is a skill for carrying out a planned task through a required panel workflow. It records role responses, decisions, verification evidence, and handoff artifacts across ordered phases.
Key features
- 01Run ordered delivery phases
- 02Keep isolated contexts by task and role
- 03Record panel responses and dissent
- 04Document verification and handoff
Use cases
- 01Deliver a task with a panel audit trail
- 02Track test evidence and review decisions
Install
Copy the command and run it in a terminal.
npx skills add https:/ / github.com/ robsonrung/ rar-skills --skill collaborative-deliveryAfter installing, type/collaborative-deliveryin Claude Code to confirm it loaded.
Bundled files
References and scripts installed along with SKILL.md.
agents/openai.yamlassets/routing.tomlreferences/output_contract.mdworkflow_contract.mdDetails
From the project READMECollaborative Delivery
Choose the branch before selecting a model. Select the task and panel roles in the current coordinator. Before starting a panel role, use shared/references/model-preview.md to bind one approved route snapshot.
Model IDs, effort support, and task defaults come only from
shared/model-routing.json. Preserve the approved snapshot during dispatch,
retry, and resume.
Use this only after an approved task plan exists and a panel audit trail is required. It is intentionally more expensive than the normal implementation path. The panel is mandatory once this skill is chosen.
Read shared/collaborative-panel-runner.md and
shared/references/host-model-execution.md before starting. They define the
panel runner, real-participation rule, status taxonomy, completion check, native
delegation, and session rules. assets/routing.toml is an editable default for
one host. Use shared/references/task-shaped-model-routing.md to bind the
selected roles in the approved snapshot. Show its exact model, execution path,
effort, and verification policy to the user. A configured model label is not a
serving-model receipt.
Outcome
Deliver one task with a recorded red, green, refactor, review, verification, and handoff trail. A phase is complete only when its required roles have real recorded responses. A generated prompt is not participation.
Workflow
- Select one task and restate its acceptance contract, expected files, and narrowest verification command. Before any role starts, record planned phase calls and concurrency against the snapshot ceilings.
- Run the phases in order:
task_intake,red,green,refactor,review,verification, andhandoff. Keep one isolated context per task and role across those phases. An implementer, reviewer, synthesizer, and adversarial role never share a context. - Every phase includes the synthesis and adversarial anchors. The configured specialist roles add their independent response. Add
backendorinterfaceas a phase role only when the current slice touches that surface. - In
red, add or update the failing test and record the expected failure. Ingreen, make the smallest change that passes it. Inrefactor, simplify only while tests stay green. - In
review, inspect correctness, data and security risk, maintainability, and fit with the task. Inverification, record commands, results, skipped checks, and reasons. - In
handoff, record changed files, behavior, evidence, decisions, limitations, and the next task.
For an exact model available through the active host, use a persistent native subagent or supported task context. Use a runner only for a foreign model or an exact route the host cannot provide. The host owns code changes. Panel roles challenge, review, and shape decisions unless the routing explicitly delegates an implementation role. Preserve dissent in the decision log. A missing role blocks a complete panel; report the gap as an accepted exception only when the user explicitly accepts it.
Artifacts
Write these files under .ai-workflow/panel/delivery unless the user selects another location:
execution_log.mdtest_evidence.mdreview_notes.mdchanged_files.mddecision_log.mdpanel_summary.json
Read references/output_contract.md before interpreting panel status or finalizing. Read references/workflow_contract.md before changing the routing or portability boundary.