cost-projection is a cost-analysis skill that estimates future spend from session records and a selected measurement window. It extrapolates the current daily rate and can show when configured budget thresholds may be reached.

Key features

  1. 01Measure spend over a selected window
  2. 02Calculate daily burn rate
  3. 03Project spend across time horizons
  4. 04Estimate budget threshold dates
  5. 05Output tables or JSON

Use cases

  1. 01Plan finance or SRE budgets
  2. 02Gate CI on projected budget exhaustion
  3. 03Check spending after workload changes

Install

Copy the command and run it in a terminal.

$npx skills add https://github.com/ruvnet/ruflo --skill cost-projection

After installing, type/cost-projectionin Claude Code to confirm it loaded.

Details

From the project README

Forward-looking cost projection that pairs with cost-budget-check:

  • cost-budget-check answers "have we crossed the line?" — reactive
  • cost-projection answers "when will we cross the line?" — predictive

Algorithm

  1. Read all session-* records from the cost-tracking namespace (same source cost-budget-check uses).
  2. Filter to a measurement window (default last 7 days on capturedAt/startedAt).
  3. Compute the per-day burn rate: windowSpend / windowDays.
  4. Linear-extrapolate to each requested horizon (default 7d/30d/90d/365d).
  5. If a budget is configured (budget-config key set by cost-budget set):
    • Compute "days until 75% / 90% / 100% consumed" at the current rate.
    • Surface as a separate table block with ALREADY REACHED markers for thresholds already exceeded.

Flags

--window Measurement window. Nh|Nd|Nw|Nm. Default 7d. --horizons Projection horizons. Default 7d,30d,90d,365d. --format table|json Default table (markdown).

Env: PROJECTION_NAMESPACE override (default cost-tracking), PROJECTION_QUIET=1 (alias for --format json).

Smoke transcript (3 sessions × $1 over 7d, $20 budget)

| Sessions in window | 3 |
| Window spend | $3.000000 |
| **USD per day** | **$0.428571** |
| All-time spend | $3.000000 across 3 sessions |

## Projected spend (linear extrapolation)
| Horizon | Days | Projected spend |
|---|---:|---:|
| 7d | 7 | $3.0000 |
| 30d | 30 | $12.8571 |

## Budget exhaustion ($20.00 configured)
| Threshold | Target | Remaining | Time at current rate |
|---|---:|---:|---|
| 75% | $15.00 | $12.00 | 28.0 days |
| 90% | $18.00 | $15.00 | 35.0 days |
| 100% | $20.00 | $17.00 | 39.7 days |

When to use

  • Finance / SRE planning: hand the JSON output to a budget dashboard for "are we on track for the quarter?".
  • CI gates: cost-projection --format json | jq '.budget.exhaustion[2].daysUntilReached < 7' → fail builds when 100% exhaustion is < 1 week away.
  • Post-workload-shift sanity check: after a big feature lands, re-run to verify the rate hasn't accelerated past expectations.

Stationarity assumption

Linear extrapolation assumes the current rate holds. The footer reminds operators to re-run after workload shifts. For drift detection over MULTIPLE windows, pair with cost-trend (which already covers benchmark-drift).