Maintenancepm is a maintenance-planning skill for machine shops, with preventive-maintenance schedules and checklists organized by equipment and service interval. It also provides maintenance logs, spare-parts guidance, and MTBF-based interval calculations.

Key features

  1. 01Machine-specific PM schedules
  2. 02Daily to annual checklists
  3. 03Maintenance log templates
  4. 04Critical spare-parts guidance
  5. 05MTBF-based PM intervals

Use cases

  1. 01Find weekly service tasks for a machine
  2. 02Create a shift or monthly checklist
  3. 03Estimate PM timing from failure data
  4. 04Prepare maintenance logs and spare stocks

Install

Copy the command and run it in a terminal.

$npx skills add https://github.com/robdtaylor/personal-ai-infrastructure --skill maintenancepm

After installing, type/maintenancepmin Claude Code to confirm it loaded.

Details

From the project README

MaintenancePM - Preventive Maintenance System

Purpose: Protect capital equipment investment through systematic preventive maintenance.

When to Activate

  • "What's the PM schedule for NLX2500?"
  • "Create maintenance checklist"
  • "What's due for service?"
  • "TPM checklist for Swiss machines"
  • "Maintenance history for [machine]"
  • "PM planning"

Maintenance Philosophy

Total Productive Maintenance (TPM)
LevelResponsibilityFrequencyExamples
OperatorDaily/ShiftEvery shiftCleaning, lubrication, visual checks
TechnicianWeekly/MonthlyScheduledFilter changes, calibration, adjustments
SpecialistQuarterly/AnnualPlannedMajor service, rebuilds, alignments
OEMAs requiredScheduledWarranty service, major repairs

DMG MORI Machines

Daily Checks (Operator - Every Shift)
# Daily PM Checklist - DMG MORI

Machine: _____________ Date: _________ Operator: _________

## Start of Shift

| Check | OK | Issue | Notes |
|-------|-----|-------|-------|
| Coolant level | ☐ | ☐ | |
| Coolant concentration (refractometer) | ☐ | ☐ | Target: ___% |
| Hydraulic oil level | ☐ | ☐ | |
| Way lube level | ☐ | ☐ | |
| Air pressure (6 bar min) | ☐ | ☐ | |
| Chip conveyor clear | ☐ | ☐ | |
| Guards/doors function | ☐ | ☐ | |
| No unusual noises | ☐ | ☐ | |
| Spindle warm-up complete | ☐ | ☐ | |

## End of Shift

| Task | Done | Notes |
|------|------|-------|
| Clean machine exterior | ☐ | |
| Remove chips from work area | ☐ | |
| Wipe down way covers | ☐ | |
| Return tools to crib | ☐ | |
| Report any issues | ☐ | |

Signature: _____________
Weekly PM - DMG MORI Mills (NMV3000, DMU50, NHX500)
# Weekly PM - DMG MORI 5-Axis Mill

Machine: _____________ Week: _________ Tech: _________

| Task | Done | Reading/Notes |
|------|------|---------------|
| Check spindle runout | ☐ | TIR: ___μm (max 5μm) |
| Inspect tool changer | ☐ | |
| Clean coolant tank strainer | ☐ | |
| Check way lube distribution | ☐ | |
| Inspect pallet changer (if equipped) | ☐ | |
| Verify probe calibration | ☐ | |
| Check air dryer/filter | ☐ | |
| Inspect chip conveyor belt | ☐ | |
| Check hydraulic filter indicator | ☐ | |
| Clean control cabinet filter | ☐ | |

## Pallet System (NMV3000/DMU50)
| Task | Done | Notes |
|------|------|-------|
| Check pallet locating surfaces | ☐ | |
| Verify pallet clamping | ☐ | |
| Lubricate pallet transfer | ☐ | |

Issues Found: ___________________________________
Action Taken: ___________________________________
Weekly PM - DMG MORI Lathes (NLX2500, ALX2000)
# Weekly PM - DMG MORI Turning Centre

Machine: _____________ Week: _________ Tech: _________

| Task | Done | Reading/Notes |
|------|------|---------------|
| Check chuck clamping pressure | ☐ | Main: ___bar Sub: ___bar |
| Inspect turret indexing | ☐ | |
| Check tailstock alignment (if used) | ☐ | |
| Verify bar feeder operation | ☐ | |
| Clean chip conveyor | ☐ | |
| Check coolant nozzle positioning | ☐ | |
| Inspect sub-spindle (NLX2500) | ☐ | |
| Verify tool sensor operation | ☐ | |
| Check hydraulic pressure | ☐ | ___bar |
| Clean/replace coolant filter | ☐ | |

Live Tooling Check:
| Task | Done | Notes |
|------|------|-------|
| Check live tool runout | ☐ | TIR: ___μm |
| Lubricate live tool holders | ☐ | |
| Verify C-axis indexing | ☐ | |
Monthly PM - All DMG MORI
# Monthly PM - DMG MORI

Machine: _____________ Month: _________ Tech: _________

## Lubrication
| Task | Done | Notes |
|------|------|-------|
| Check/top up way lube reservoir | ☐ | Level: ___% |
| Verify lube pump operation | ☐ | |
| Grease linear guide wipers | ☐ | |
| Lubricate ball screws (if manual) | ☐ | |

## Hydraulics
| Task | Done | Notes |
|------|------|-------|
| Check hydraulic oil level | ☐ | |
| Inspect for leaks | ☐ | |
| Check pressure gauge accuracy | ☐ | |

## Coolant System
| Task | Done | Notes |
|------|------|-------|
| Clean coolant tank thoroughly | ☐ | |
| Replace coolant filters | ☐ | |
| Check pump operation | ☐ | |
| Verify through-spindle pressure | ☐ | ___bar |

## Electrical
| Task | Done | Notes |
|------|------|-------|
| Clean control cabinet (air blow) | ☐ | |
| Check fan operation | ☐ | |
| Inspect cables for damage | ☐ | |

## Accuracy Check
| Measurement | Spec | Actual | Pass |
|-------------|------|--------|------|
| Spindle runout | <5μm | | ☐ |
| Axis backlash X | <5μm | | ☐ |
| Axis backlash Y | <5μm | | ☐ |
| Axis backlash Z | <5μm | | ☐ |
Annual PM - DMG MORI
TaskIntervalLast DoneNext DueNotes
Ball screw inspectionAnnualOEM or trained tech
Spindle bearing checkAnnualVibration analysis
Geometric alignmentAnnualLaser or ballbar
Hydraulic oil changeAnnual/2000hr
Way lube oil changeAnnual
Coolant full change6 months
Encoder battery2 yearsCRITICAL
Control backupAnnual

HARDINGE Precision Lathe

Daily - Operator
# Daily PM - HARDINGE

| Check | OK | Issue |
|-------|-----|-------|
| Spindle warm-up (20 min) | ☐ | ☐ |
| Collet/chuck cleanliness | ☐ | ☐ |
| Coolant level and temp | ☐ | ☐ |
| Air pressure | ☐ | ☐ |
| No unusual vibration | ☐ | ☐ |
Weekly - Precision Checks
# Weekly PM - HARDINGE

| Task | Done | Reading |
|------|------|---------|
| Spindle runout check | ☐ | TIR: ___μm (max 2μm) |
| Temperature log start/end | ☐ | Start: ___°C End: ___°C |
| Collet concentricity | ☐ | TIR: ___μm |
| Sub-spindle alignment | ☐ | |

CITIZEN Swiss Machines

Daily - Operator
# Daily PM - CITIZEN Swiss

Machine: [ ] Laser Head  [ ] LFV
Date: _________ Operator: _________

| Check | OK | Issue | Notes |
|-------|-----|-------|-------|
| Oil level | ☐ | ☐ | |
| Oil temperature | ☐ | ☐ | Target: 25-30°C |
| Guide bushing condition | ☐ | ☐ | |
| Bar stock quality | ☐ | ☐ | |
| Chip evacuation | ☐ | ☐ | |
| Air pressure (5 bar) | ☐ | ☐ | |
| Mist collector filter | ☐ | ☐ | |
| Part catcher clear | ☐ | ☐ | |
Weekly - Swiss Specific
# Weekly PM - CITIZEN Swiss

| Task | Done | Notes |
|------|------|-------|
| Clean guide bushing area | ☐ | |
| Check guide bushing wear | ☐ | |
| Inspect collet condition | ☐ | |
| Verify gang tool alignment | ☐ | |
| Check back-working tools | ☐ | |
| Clean oil filter | ☐ | |
| Verify LFV operation (if equipped) | ☐ | |
| Check laser alignment (if equipped) | ☐ | |
| Inspect bar feeder | ☐ | |
| Check sub-spindle pickup | ☐ | |

Oil Analysis (Monthly):
| Parameter | Spec | Actual | Pass |
|-----------|------|--------|------|
| Contamination | <NAS 8 | | ☐ |
| Water content | <0.1% | | ☐ |
| Viscosity | ±10% | | ☐ |
Monthly - CITIZEN
TaskDoneNotes
Full oil tank clean☐
Replace oil filter element☐
Guide bushing replacement (if worn)☐
Check Z-axis gibs☐
Verify spindle accuracy☐
Clean electrical cabinet☐

MITSUBISHI EDM

Daily - Wire EDM
# Daily PM - MITSUBISHI Wire EDM

Date: _________ Operator: _________

| Check | OK | Issue |
|-------|-----|-------|
| Dielectric level | ☐ | ☐ |
| Dielectric conductivity | ☐ | ☐ | Reading: ___μS |
| Wire path clear | ☐ | ☐ |
| Filter pressure | ☐ | ☐ |
| Wire guides condition | ☐ | ☐ |
| Flushing nozzles clear | ☐ | ☐ |
| Wire tension | ☐ | ☐ |
| Auto-threader operation | ☐ | ☐ |
Daily - Spark EDM
# Daily PM - MITSUBISHI Spark EDM

Date: _________ Operator: _________

| Check | OK | Issue |
|-------|-----|-------|
| Dielectric level | ☐ | ☐ |
| Dielectric clarity | ☐ | ☐ |
| Filter condition | ☐ | ☐ |
| Electrode holder clean | ☐ | ☐ |
| Flush pump operation | ☐ | ☐ |
| Fire suppression OK | ☐ | ☐ |
Weekly - Both EDM Types
TaskDoneNotes
Check dielectric conductivity☐Target: 20-40μS
Clean/replace filters☐
Inspect wire guides (wire)☐
Check AWT roller condition (wire)☐
Verify axis accuracy☐
Clean work tank☐
Check resin condition☐
Monthly - EDM
TaskDoneNotes
Full dielectric change☐If contaminated
Replace deionizing resin☐When conductivity rises
Wire guide replacement☐Every 200-400 hrs
Power feed contact check☐
Geometric accuracy check☐

Haas Fast Response Cell

Daily - Operator
# Daily PM - Haas

Machine: [ ] Mini Mill  [ ] Tool Room Lathe

| Check | OK | Issue |
|-------|-----|-------|
| Coolant level | ☐ | ☐ |
| Way lube level | ☐ | ☐ |
| Chip tray clear | ☐ | ☐ |
| Air pressure | ☐ | ☐ |
| Tool changer cycle | ☐ | ☐ |
| Spindle warm-up | ☐ | ☐ |
Weekly
TaskDoneNotes
Check spindle runout☐
Verify tool changer alignment☐
Clean coolant tank☐
Check way covers☐
Grease as required☐

Maintenance Schedule Summary

Daily (Every Shift)
MachineKey Checks
AllFluid levels, air pressure, visual inspection
MillsSpindle warm-up, tool changer
LathesChuck pressure, bar feeder
SwissOil temp, guide bushing
EDMDielectric level/conductivity
Weekly
MachineKey Tasks
AllAccuracy checks, filter inspection
MillsPallet system, probe calibration
LathesTurret, live tooling
SwissGuide bushing wear, oil filter
EDMWire guides, filter change
Monthly
MachineKey Tasks
AllFull cleaning, lubrication top-up
MillsCoolant change, accuracy verification
LathesHydraulic check, tailstock alignment
SwissOil tank clean, full inspection
EDMResin check, geometric accuracy
Quarterly
MachineKey Tasks
AllMajor filter replacements
MillsBallbar test
LathesSpindle bearing analysis
SwissOEM service items
EDMFull calibration
Annual
MachineKey Tasks
AllFull OEM service, geometry check, major PM
AllBackup all programs and parameters
AllHydraulic/lube oil change

Maintenance Log Template

# Maintenance Log

Machine: _____________
Machine ID: ___________

| Date | Type | Hours | Description | Parts Used | Tech | Time |
|------|------|-------|-------------|------------|------|------|
| | PM | | | | | |
| | Repair | | | | | |
| | PM | | | | | |

Spare Parts Stock

Critical Spares (Keep on-site)
MachineItemQtyLead TimeSupplier
AllCoolant filters102 days
AllWay lube filters52 days
SwissGuide bushings (common sizes)5 ea5 days
SwissCollets3 ea3 days
EDMWire guides2 sets5 days
EDMResin1 unit3 days
EDMFilters102 days
AllEncoder batteries23 daysCRITICAL
Order Lead Times
SupplierTypeTypical Lead
DMG MORISpare parts3-10 days
CITIZENSpare parts5-14 days
MITSUBISHIEDM parts3-7 days
HaasSpare parts3-7 days

MTBF Calculation & Data-Driven PM Intervals

How to Calculate MTBF

MTBF (Mean Time Between Failures) = Total Operating Hours ÷ Number of Failures

Example: Machine runs 2,000 hours and has 4 breakdowns → MTBF = 500 hours

Setting PM Intervals from MTBF
MTBF ResultRecommended PM IntervalRationale
MTBF = 500 hrsPM at 350 hrs (70% of MTBF)Intervene before predicted failure
MTBF = 200 hrsPM at 140 hrs (70% of MTBF)High-failure item needs more frequent checks
MTBF = 1000 hrsPM at 700 hrs (70% of MTBF)Reliable item, less frequent PM justified

Rule: Set PM interval = 70% × MTBF to catch deterioration before failure occurs.

MTBF Tracking Template
# Downtime Log - [Month]

| Date | Machine | Start | End | Hours | Cause | Action | Category |
|------|---------|-------|-----|-------|-------|--------|----------|
| | | | | | | | PM/Breakdown/Setup |

## Monthly Summary

| Category | Hours | % of Total |
|----------|-------|------------|
| Planned PM | | |
| Breakdown | | |
| Waiting Parts | | |
| Other | | |
| **Total** | | |

## Machine Availability

| Machine | Available Hrs | Downtime | Availability % |
|---------|---------------|----------|----------------|
| | | | |

Target: >95% Availability

Workflow Routing

TriggerAction
"PM schedule for [machine]"Look up machine section, output relevant interval checklists
"What's due for service?"Present Maintenance Schedule Summary tables
"Create maintenance checklist"Generate daily/weekly/monthly checklist for named machine
"TPM checklist"Output TPM level table + appropriate operator checklist
"Maintenance history"Provide Maintenance Log Template
"Spare parts / what to stock"Output Critical Spares table
"MTBF / PM intervals"Explain MTBF calculation, provide tracking template

Examples

Example 1 — PM schedule lookup

"What's the weekly PM for the NLX2500?" Responds with the Weekly PM - DMG MORI Turning Centre checklist including chuck pressure, turret indexing, bar feeder, coolant filter, and live tooling checks.

Example 2 — Upcoming service

"What maintenance is due this month for the CITIZEN Swiss?" Responds with the Monthly CITIZEN checklist: full oil tank clean, replace oil filter element, guide bushing check, Z-axis gibs, spindle accuracy, and cabinet cleaning.

Example 3 — TPM checklist generation

"Generate a daily TPM checklist for the Mitsubishi Wire EDM" Responds with the Daily PM - MITSUBISHI Wire EDM checklist covering dielectric level, conductivity, wire path, filter pressure, guides, flushing nozzles, wire tension, and auto-threader.

Example 4 — MTBF-based interval

"Our NMV3000 has had 4 breakdowns in 2000 hours. What PM interval should we use?" Calculates MTBF = 500 hours, recommends PM at 350 hours (70% × MTBF rule), and suggests updating the Monthly PM frequency accordingly.


Integration

  • PlantCapability: Factor maintenance windows into capacity
  • SkillsMatrix: Who is trained for which PM tasks
  • TribalKnowledge: Capture maintenance tips and tricks
  • OEETracker: Availability component of OEE