About mfg-predictive-maintenance

A skill for developing predictive maintenance plans based on equipment criticality, condition data, and failure risk. It covers sensor selection, baseline collection, model approaches, operational alerts, and ROI estimation.

Key features

  1. 01Equipment criticality assessment
  2. 02Sensor selection by failure mode
  3. 03RUL model approach comparison
  4. 04Implementation phases and alert workflows
  5. 05Maintenance ROI calculation

Use cases

  1. 01Prioritizing equipment for condition monitoring
  2. 02Selecting sensors for rotating machinery
  3. 03Planning alerts to reduce unplanned downtime

Install

Copy the command and run it in a terminal.

$npx skills add https://github.com/asgard-ai-platform/skills --skill mfg-predictive-maintenance

After installing, type/mfg-predictive-maintenancein Claude Code to confirm it loaded.

Bundled files

References and scripts installed along with SKILL.md.

examples/
sample_scenario.md
references/
rul-tutorial.md
sensor-guide.md

Details

From the project README

Predictive Maintenance

Framework

IRON LAW: Predictive > Preventive > Reactive (but each has its place)

Reactive (fix after failure): cheapest per-event, most expensive in downtime
Preventive (fix on schedule): prevents some failures, causes unnecessary maintenance
Predictive (fix based on condition): lowest total cost, requires sensor investment

Not ALL equipment justifies predictive maintenance. Apply to equipment where
unplanned downtime cost >> sensor investment cost.
Maintenance Strategy Comparison
StrategyWhen to MaintainAdvantageDisadvantageBest For
ReactiveAfter failureZero upfront costMax downtime, safety riskNon-critical, cheap-to-replace equipment
PreventiveOn schedule (time/cycles)Predictable, simpleOver-maintenance (replacing parts that still work)Equipment with known wear patterns
PredictiveBased on condition dataMinimize downtime AND maintenance costRequires sensors, data infrastructure, modelsCritical, expensive, failure-has-cascading-effect equipment
P-F Curve (Potential Failure → Functional Failure)
Condition
  │
  │  ●─── P (Potential failure detected by sensor)
  │     ╲
  │      ╲  ← P-F Interval (time to act)
  │       ╲
  │        ● F (Functional failure — equipment stops)
  │
  └──────────────────── Time

The P-F interval is your window of opportunity. Detect at P, schedule
repair before F. The longer the P-F interval, the more planning time.
Sensor Data Types
Data TypeWhat It DetectsEquipment
VibrationBearing wear, imbalance, misalignmentRotating machinery (motors, pumps, turbines)
TemperatureOverheating, friction, electrical faultsMotors, transformers, bearings
Current/PowerLoad changes, electrical degradationElectric motors, drives
AcousticLeaks, cavitation, micro-cracksPressure systems, pipes, valves
Oil analysisWear particles, contaminationGearboxes, hydraulic systems
ML Models for RUL (Remaining Useful Life)
ApproachMethodData Required
StatisticalWeibull distribution, exponential degradationHistorical failure times
Classical MLRandom Forest, Gradient Boosting on sensor featuresLabeled run-to-failure datasets
Deep LearningLSTM, 1D-CNN on raw sensor time seriesLarge volumes of sensor data
Anomaly DetectionIsolation Forest, AutoencoderNormal operation data only (no failure labels needed)
Implementation Steps

Phase 1: Select Equipment (criticality analysis)

  • Which equipment has highest downtime cost?
  • Which has cascading failure effects?
  • Prioritize: high cost × high frequency

Phase 2: Install Sensors

  • Match sensor type to failure mode (see table above)
  • Establish data pipeline: sensor → edge/cloud → storage

Phase 3: Build Baseline

  • Collect 3-6 months of normal operation data
  • Establish "healthy" patterns

Phase 4: Develop Models

  • Start simple: threshold-based alerts (vibration > X = warning)
  • Graduate to ML models as data accumulates
  • Anomaly detection if you have few/no failure examples

Phase 5: Operationalize

  • Integrate alerts into maintenance workflow (CMMS)
  • Define response procedures for each alert level
  • Measure: reduction in unplanned downtime, maintenance cost savings
ROI Calculation
Annual Savings = (Unplanned downtime hours reduced × Downtime cost/hour)
               + (Preventive maintenance events avoided × Cost per event)
               - (Sensor + infrastructure + model development cost)

Output Format

# Predictive Maintenance Plan: {Equipment/Line}

## Equipment Criticality
| Equipment | Downtime Cost/hr | Failure Frequency | Cascading? | Priority |
|-----------|-----------------|-------------------|-----------|---------|
| {name} | ${X} | {X/year} | Y/N | H/M/L |

## Sensor Plan
| Equipment | Failure Mode | Sensor Type | P-F Interval |
|-----------|-------------|-------------|-------------|
| {name} | {mode} | {sensor} | {est. hours/days} |

## Projected ROI
| Metric | Before | After | Savings |
|--------|--------|-------|---------|
| Unplanned downtime | {hrs/year} | {hrs/year} | ${X}/year |
| Maintenance cost | ${X}/year | ${X}/year | ${X}/year |
| Sensor investment | — | ${X} one-time | Payback: {months} |

Gotchas

  • Start with vibration monitoring: It's the most mature, best-understood predictive technique. 80% of rotating equipment failures can be predicted by vibration analysis alone.
  • Data quality > model complexity: A simple threshold alert on clean sensor data outperforms a sophisticated ML model on noisy, incomplete data. Fix data quality first.
  • False positives kill adoption: If the model cries wolf too often, maintenance teams ignore it. Tune for high precision (few false alarms) even at the cost of some missed detections early on.
  • Cultural change is harder than technology: Shifting from "run to failure" culture requires management buy-in and maintenance team training. Technology alone won't change behavior.

References

  • For sensor selection guide by equipment type, see references/sensor-guide.md
  • For LSTM-based RUL model tutorial, see references/rul-tutorial.md