mcpField
O
operations

operations

github.com/travisjneumanOther106152 installsUpdated 1d ago
Repository

About operations

An operations reference for operations and supply-chain practitioners, covering Lean, Six Sigma, quality, capacity, and vendor management. It supports process improvement and operational planning.

Key features

  1. 01Lean manufacturing and waste identification
  2. 02Six Sigma DMAIC framework
  3. 03Supply-chain strategies and KPIs
  4. 04Demand forecasting and inventory management
  5. 05Quality tools and process control
  6. 06Capacity and vendor management

Use cases

  1. 01Identify waste in production processes
  2. 02Set supply-chain performance metrics
  3. 03Choose forecasting and inventory methods
  4. 04Assess quality and process stability

Install

Copy the command and run it in a terminal.

$npx skills add https://github.com/travisjneuman/.claude --skill operations

After installing, type/operationsin Claude Code to confirm it loaded.

Bundled filesreferences/operations-excellence-skill.md

Details

From the project README

Operations Expert

Comprehensive operations frameworks for process improvement, supply chain management, and operational excellence.

Operational Excellence Frameworks

Lean Manufacturing Principles
THE 5 PRINCIPLES OF LEAN:
1. Value - Define from customer perspective
2. Value Stream - Map all steps, eliminate waste
3. Flow - Make value-creating steps flow smoothly
4. Pull - Let customer demand drive production
5. Perfection - Continuously improve toward perfection
8 Wastes (DOWNTIME)
WasteDefinitionExamplesCountermeasures
DefectsWork requiring rework/scrapQuality issues, errorsPoka-yoke, quality at source
OverproductionMaking more than neededExcess inventory, WIPPull systems, kanban
WaitingIdle time between processesQueue time, approvalsFlow optimization, cross-training
Non-utilized talentUnderusing employee skillsManual data entry, routine tasksEmpowerment, automation
TransportationUnnecessary movement of materialsMultiple handling, poor layoutFacility layout optimization
InventoryExcess stock/materialsSafety stock, WIPJIT, demand planning
MotionUnnecessary worker movementPoor workstation design5S, ergonomics
Extra processingMore work than requiredOver-engineering, redundant checksValue stream mapping
Six Sigma DMAIC
DEFINE
- Problem statement
- Project charter
- Voice of customer (VOC)
- SIPOC diagram
- CTQ (Critical to Quality) tree

MEASURE
- Data collection plan
- Process capability (Cp, Cpk)
- Measurement system analysis
- Baseline metrics

ANALYZE
- Root cause analysis (5 Whys, Fishbone)
- Statistical analysis
- Process mapping
- Hypothesis testing

IMPROVE
- Solution generation
- Pilot testing
- Implementation plan
- Risk assessment (FMEA)

CONTROL
- Control plan
- Statistical process control (SPC)
- Standard operating procedures
- Training and handoff
Six Sigma Metrics
Sigma LevelDPMOYield
1691,46230.9%
2308,53869.1%
366,80793.3%
46,21099.4%
523399.98%
63.499.9997%

Supply Chain Management

Supply Chain Strategy
StrategyWhen to UseKey Characteristics
EfficientStable demand, commodity productsLow cost, high utilization, minimal inventory
ResponsiveUnpredictable demand, innovative productsSpeed, flexibility, buffer inventory
Risk-HedgingSupply uncertaintyMultiple suppliers, pooled inventory
AgileDemand and supply uncertaintyAll above combined, modular design
SCOR Model (Supply Chain Operations Reference)
PLAN
- Demand planning
- Supply planning
- S&OP process
- Inventory planning

SOURCE
- Supplier selection
- Contract negotiation
- Procurement
- Supplier performance

MAKE
- Production scheduling
- Manufacturing execution
- Quality management
- Capacity management

DELIVER
- Order management
- Warehousing
- Transportation
- Last-mile delivery

RETURN
- Reverse logistics
- Returns processing
- Warranty management
- Disposal/recycling

ENABLE
- Business rules
- Performance management
- Data management
- Risk management
Supply Chain KPIs
CategoryMetricFormulaTarget
ReliabilityPerfect Order(Complete, On-time, Damage-free, Accurate docs) / Total95%+
OTIFOrders On-Time In-Full / Total Orders98%+
ResponsivenessOrder Cycle TimeOrder receipt to deliveryIndustry specific
Lead TimeRequest to fulfillmentMinimize
AgilityUpside Flexibility% increase possible in 30 days20%+
Supply Chain AdaptabilityTime to adjust to market changeMinimize
CostSupply Chain CostTotal SC cost / Revenue5-10%
COGSCost of Goods Sold / RevenueIndustry specific
Asset ManagementCash-to-CashDIO + DSO - DPOIndustry specific
Inventory TurnsCOGS / Average InventoryHigher is better

Demand Planning & Forecasting

Forecasting Methods
MethodUse CaseAccuracy
Moving AverageStable demandLow-Medium
Exponential SmoothingTrend dataMedium
RegressionCausal relationshipsMedium-High
ARIMAComplex patternsHigh
Machine LearningLarge datasets, many variablesHigh
CollaborativeRetail, promotionsMedium-High
S&OP (Sales & Operations Planning)
MONTHLY S&OP CYCLE:

Week 1: Data Gathering
- Update sales forecast
- Review actual vs. plan
- Identify issues

Week 2: Demand Planning
- Demand review meeting
- Consensus forecast
- New product planning

Week 3: Supply Planning
- Capacity analysis
- Inventory planning
- Resource requirements

Week 4: Pre-S&OP
- Gap analysis
- Scenario planning
- Financial reconciliation

Week 5: Executive S&OP
- Final decisions
- Resource allocation
- Performance review
Inventory Management
ModelFormulaUse Case
EOQ√(2DS/H)Constant demand
Safety Stockz × σ × √LTBuffer uncertainty
Reorder Point(D × LT) + SSTrigger replenishment
ABC CLASSIFICATION:
A Items: 20% of SKUs, 80% of value → Tight control
B Items: 30% of SKUs, 15% of value → Moderate control
C Items: 50% of SKUs, 5% of value → Minimal control

XYZ CLASSIFICATION (Variability):
X: Low variability (CV < 0.5) → Predictable
Y: Medium variability (0.5 < CV < 1.0) → Some variation
Z: High variability (CV > 1.0) → Sporadic

Quality Management

Total Quality Management (TQM)
TQM PRINCIPLES:
1. Customer focus
2. Total employee involvement
3. Process-centered
4. Integrated system
5. Strategic and systematic approach
6. Continuous improvement
7. Fact-based decision making
8. Communications
Quality Tools
ToolPurposeWhen to Use
Pareto ChartIdentify vital fewPrioritizing problems
Fishbone DiagramRoot cause analysisProblem investigation
Control ChartsMonitor process stabilityOngoing monitoring
HistogramShow distributionUnderstanding variation
Scatter DiagramShow correlationRelationship analysis
Check SheetData collectionSystematic recording
FlowchartVisualize processProcess understanding
Statistical Process Control (SPC)
CONTROL CHART RULES (Western Electric):
Rule 1: One point beyond 3σ
Rule 2: 2 of 3 points beyond 2σ (same side)
Rule 3: 4 of 5 points beyond 1σ (same side)
Rule 4: 8 points in a row on one side of center
Rule 5: 6 points trending up or down
Rule 6: 14 points alternating up and down
Rule 7: 15 points within 1σ (reduced variation)
Rule 8: 8 points beyond 1σ (both sides)

Capacity Planning

Capacity Analysis
CAPACITY METRICS:
Design Capacity: Maximum theoretical output
Effective Capacity: Expected output given constraints
Actual Output: Real production achieved

Utilization = Actual Output / Design Capacity
Efficiency = Actual Output / Effective Capacity

CAPACITY STRATEGIES:
Lead: Build capacity ahead of demand
Lag: Build capacity after demand materializes
Match: Incrementally match demand
Production Planning
Planning LevelHorizonDecisions
Strategic1-5 yearsFacilities, major equipment
Tactical3-18 monthsWorkforce, inventory levels
OperationalDays-weeksScheduling, sequencing

Vendor Management

Supplier Evaluation Criteria
QCDDM FRAMEWORK:
Q - Quality (PPM, certification, capability)
C - Cost (Price, TCO, cost reduction)
D - Delivery (OTIF, lead time, flexibility)
D - Development (Innovation, collaboration)
M - Management (Financial stability, risk)

SCORECARD WEIGHTS (example):
Quality: 30%
Delivery: 25%
Cost: 25%
Service: 10%
Innovation: 10%
Supplier Relationship Tiers
TierRelationshipCharacteristics
StrategicPartnershipJoint development, long-term, shared risk
PreferredCollaborationVolume commitment, improvement programs
ApprovedTransactionalCompetitive bidding, standard terms
SpotOne-timeEmergency purchases, minimal vetting
Contract Management
KEY CONTRACT ELEMENTS:
- Scope of work / specifications
- Pricing structure (fixed, cost-plus, tiered)
- Volume commitments
- Quality requirements and remedies
- Delivery terms (Incoterms)
- IP ownership
- Liability and indemnification
- Force majeure
- Termination rights
- Performance metrics / SLAs
- Dispute resolution

Process Improvement Methodology

Value Stream Mapping
CURRENT STATE MAP:
1. Identify product family
2. Map customer requirements
3. Walk the process
4. Collect data (cycle time, changeover, uptime)
5. Calculate lead time vs. process time
6. Identify waste

FUTURE STATE MAP:
1. Calculate takt time
2. Implement continuous flow where possible
3. Use pull systems
4. Level production
5. Identify kaizen bursts
6. Calculate new lead time
Kaizen Events
PhaseDurationActivities
Preparation2-4 weeksScope, team, data gathering
Event3-5 daysAnalysis, solution design, implementation
Follow-up30-60 daysSustain, measure, adjust
5S Methodology
StepJapaneseEnglishActions
1SeiriSortRemove unnecessary items
2SeitonSet in OrderOrganize remaining items
3SeisoShineClean work area
4SeiketsuStandardizeCreate standards
5ShitsukeSustainMaintain discipline

Operational Metrics Dashboard

Key Operating Metrics
CategoryMetricFrequency
SafetyTRIR, Lost TimeDaily
QualityFirst Pass Yield, Defect RateDaily
DeliveryOTIF, Lead TimeDaily
CostUnit Cost, ProductivityWeekly
InventoryTurns, DOSWeekly
EquipmentOEE, DowntimeDaily
OEE (Overall Equipment Effectiveness)
OEE = Availability × Performance × Quality

Availability = Run Time / Planned Production Time
Performance = (Total Count × Ideal Cycle Time) / Run Time
Quality = Good Count / Total Count

WORLD-CLASS OEE: 85%+
- Availability: 90%
- Performance: 95%
- Quality: 99%

See Also

Comments

Markdown supported