product-launch-checklist is a tiered launch-planning skill for product teams, covering pre-launch readiness, launch execution, and post-launch monitoring. After approval, its checklist can be passed to action-runner for preview and execution of approved items.

Key features

  1. 01Generate checklists by launch tier
  2. 02Cover engineering, marketing, support, and analytics
  3. 03Set Go/No-Go criteria and owners
  4. 04Plan staged rollout and rollback checks
  5. 05Schedule post-launch metrics reviews

Use cases

  1. 01Plan a product or feature launch
  2. 02Assign team responsibilities during a launch
  3. 03Check readiness, rollback, and follow-up monitoring

MCP support

After approval, the skill can hand checklist items to action-runner, which previews and executes approved actions through a connected action MCP. Examples include filing GitHub or Linear issues and posting a summary to Slack.

Install

Copy the command and run it in a terminal.

$npx skills add https://github.com/mohitagw15856/pm-claude-skills --skill product-launch-checklist

After installing, type/product-launch-checklistin Claude Code to confirm it loaded.

Details

From the project README

Product Launch Checklist Skill

Never launch without checking everything. Generate a complete, role-assigned checklist covering pre-launch readiness, launch day execution, and post-launch monitoring.

Proposes Actions

Once the checklist is approved, it can be executed: hand the items to action-runner, which previews them (dry-run, risk-rated), runs only what you approve via the connected action MCP (GitHub/Linear/Slack), and records what was done back to the brain. Typical: open an issue per checklist item in the named repo/project (🟡), and post the launch summary to Slack (🔴 — approved individually). This skill proposes; action-runner gates and runs — never silently.

Required Inputs

Ask the user for these if not provided:

  • Launch name and planned launch date
  • Launch tier (1 = major product launch, 2 = significant feature release, 3 = incremental update)
  • Team members and their roles (engineering lead, PM, marketing, support, etc.)
  • Feature description (what is being launched)
  • Rollback capability (can this be feature-flagged or reverted quickly?)

Reads from / Writes to the Brain

If a professional-brain (brain/) exists, use it before asking:

  • Read first: the entities/ feature being launched and related decisions/ (scope, dates, owners).
  • Write after: log launch decisions and owners to decisions/. This skill can also hand the checklist to action-runner to file the tickets — which records what was actually done back to the brain, closing the loop.

How to Use This Skill

Provide:

  • Launch name and date
  • Launch tier (1 = major, 2 = feature, 3 = incremental)
  • Team members and their roles

The skill generates a tiered checklist. Tier 3 launches use only the Essentials section. Tier 2 adds Marketing & Comms. Tier 1 uses all sections.


Output Format

Launch Checklist — [Feature/Product Name] — Target Date: [Date]

Launch Tier: [1 / 2 / 3] Launch Owner: [PM Name] Engineering Lead: [Name] Go/No-Go Decision By: [Date and time — typically 24 hours before launch]


🔧 PRE-LAUNCH — Engineering & Product (T-2 weeks)
  • Feature flag created and tested in staging
  • All acceptance criteria signed off by PM
  • Code reviewed and merged to main
  • QA sign-off completed (regression + new feature)
  • Performance testing completed (load, latency)
  • Security review completed (if data or auth changes)
  • Rollback procedure documented and tested
  • Monitoring and alerting configured
  • Error logging in place with correct severity levels
  • Database migrations tested on staging with production data volume
📢 PRE-LAUNCH — Marketing & Comms (T-1 week)
  • Blog post written, reviewed, and scheduled
  • In-app announcement or tooltip configured
  • Email campaign drafted and QA'd
  • Social media posts drafted and scheduled
  • Landing page or feature page live in staging
  • Press outreach sent (Tier 1 only)
  • Product Hunt / community posts prepared (Tier 1 only)
🎓 PRE-LAUNCH — Sales & Support (T-1 week)
  • Sales enablement one-pager completed
  • FAQ document shared with sales and support teams
  • Help centre articles written and published
  • Support team demo / training completed
  • Customer success team briefed on top accounts
  • Pricing updated (if applicable)
  • Contracts / ToS updated (if applicable)
📊 PRE-LAUNCH — Analytics (T-1 week)
  • Analytics events firing correctly in staging
  • Dashboard configured for launch metrics
  • Baseline metrics documented
  • Success criteria documented and shared with team
  • A/B test configured (if applicable)

✅ GO / NO-GO DECISION — T-24 hours
CriteriaStatusOwner
All critical bugs resolved🟢 / 🔴Eng Lead
QA sign-off complete🟢 / 🔴QA
Rollback tested🟢 / 🔴Eng Lead
Help centre articles live🟢 / 🔴Support
Monitoring active🟢 / 🔴Eng Lead
PM sign-off🟢 / 🔴PM

Go / No-Go Decision: [GO / NO-GO] Decision Owner: [PM + Eng Lead jointly]


🚀 LAUNCH DAY
  • Feature flag enabled for [X%] of users (start low — 5–10%)
  • Launch confirmed in team Slack/channel
  • Metrics dashboard open and being monitored
  • Error rate checked at T+15 min, T+1 hr, T+4 hr
  • Blog post published / email sent
  • Social posts live
  • Support team on standby for first 4 hours
  • PM available and reachable all day
  • Feature flag expanded to 50% if T+2hr checks pass
  • Feature flag expanded to 100% if T+4hr checks pass

📈 POST-LAUNCH (D+7, D+30)
  • D+7 metrics review: adoption, errors, support tickets
  • D+7 customer feedback synthesised
  • Retrospective scheduled
  • Learnings documented
  • D+30 success metrics reviewed against targets
  • Feature flag removed from codebase (clean up)
  • Follow-up features added to backlog based on feedback

Quality Checks

  • Launch tier confirmed before generating checklist (scope determines depth)
  • Go/No-Go decision has a named owner and a specific decision time
  • Rollback procedure is documented and tested (not just planned)
  • Feature flag expansion is staged (5% → 50% → 100%), not all-at-once
  • Post-launch retrospective is scheduled at launch time

Anti-Patterns

  • Do not apply a Tier 1 checklist to an incremental update — tier the launch appropriately before generating the checklist
  • Do not launch on a Friday without confirmed weekend engineering coverage
  • Do not leave the Go/No-Go decision owner as "the team" — it must be a named individual
  • Do not skip the rollback plan for Tier 1 and 2 launches — know the revert time before going live
  • Do not close the launch without scheduling the post-launch retrospective — it must be booked at launch time, not after

Guidelines

  • The Go/No-Go decision must have a named owner — "the team" is not an owner
  • Never launch on a Friday unless you have weekend engineering coverage
  • Recommend starting all launches at <10% traffic — even for simple features
  • Document rollback time: "We can revert this in X minutes" should be known before launch