About Quoteestimator

Quoteestimator is a skill for rough machining quotes and cycle-time estimates, intended for quoting work at MNMUK. It combines machine rates, material, tolerance and complexity factors with setup and operation estimates; results are preliminary and should be checked by an experienced estimator.

Key features

  1. 01Machine hourly rate reference
  2. 02Material, tolerance, and complexity factors
  3. 03Cycle-time estimates by operation
  4. 04Setup-time estimates by machine type
  5. 05Quote cost and quantity calculations
  6. 06Estimation workflow and output template

Use cases

  1. 01Preparing a rough machining quote
  2. 02Estimating part cycle time
  3. 03Checking production feasibility before pricing
  4. 04Calculating quantity-based part costs

Install

Copy the command and run it in a terminal.

$npx skills add https://github.com/robdtaylor/personal-ai-infrastructure --skill quoteestimator

After installing, type/quoteestimatorin Claude Code to confirm it loaded.

Details

From the project README

QuoteEstimator - MNMUK Quoting Support

Purpose: Rapid rough-order-of-magnitude estimates for quoting. Not a replacement for proper process planning, but gets you in the ballpark fast.

When to Activate

  • "How long to make this part?"
  • "Rough quote for [part description]"
  • "Estimate cycle time for..."
  • "What would it cost to make 500 of these?"
  • "Quick estimate for quoting"

Disclaimer

These are rough estimates for quoting purposes. Actual times depend on:

  • Specific geometry complexity
  • Tolerance requirements
  • Surface finish specs
  • Fixturing approach
  • Tooling availability
  • Operator experience

Always add contingency and verify with experienced estimator for critical quotes.


Machine Hourly Rates

MNMUK Rate Card (Adjust to your actual rates)
Machine CategoryMachineRate (£/hr)Notes
5-Axis MillNMV3000, DMU50, NHX500£85-95High capability
4-Axis MillVertical VMC£65-75Standard work
CNC TurningNLX2500, ALX2000£60-70Live tooling adds £5
Precision TurningHARDINGE£75-85±0.003mm work
SwissCITIZEN£80-90High volume, precision
Wire EDMMITSUBISHI£55-65Slow but precise
Spark EDMMITSUBISHI£50-60Electrode cost separate
Fast ResponseHaas£45-55Prototypes
Rate Factors
Base Rate × Material Factor × Tolerance Factor × Complexity Factor = Effective Rate

Material Factors

MaterialFactorReasoning
Aluminium (6061)0.8Fast cutting, easy
Aluminium (7075)0.9Slightly harder
Brass/Bronze0.85Free machining
Mild Steel (1018)1.0Baseline
Carbon Steel (4140)1.1Harder, more wear
Stainless 3031.2Free machining SS
Stainless 304/3161.4Work hardening, gummy
17-4PH1.5Tough stainless
Tool Steel (pre-hard)1.3Abrasive
Tool Steel (hardened)2.0+EDM only typically
Titanium (CP)1.6Slow speeds required
Titanium (6Al-4V)1.8Very slow, careful
Inconel 7182.2Extreme tool wear
Hastelloy2.5Worst case scenario
Delrin/Acetal0.7Easy, watch heat
PEEK1.3Expensive material
Nylon0.75Easy, flexible

Tolerance Factors

Tolerance BandFactorNotes
±0.25mm (±0.010")0.9Loose, fast
±0.125mm (±0.005")1.0Standard
±0.05mm (±0.002")1.2Careful work
±0.025mm (±0.001")1.4Precision
±0.012mm (±0.0005")1.7High precision
±0.005mm (±0.0002")2.0Grinding territory
±0.003mm2.5Swiss/HARDINGE only

Complexity Factors

ComplexityFactorExamples
Simple0.8Round part, few features
Standard1.0Typical machined part
Moderate1.3Multiple setups, tight tolerances mixed with loose
Complex1.65-axis, multiple operations, thin walls
Very Complex2.0+Extreme geometry, exotic material + tight tolerance

Cycle Time Estimation

Turning Operations
OD Turning
Time (min) = (Length × Passes × π × Diameter) / (Feed × Speed × 1000)

Simplified:
Rough: Volume removed (cm³) × 0.5 min/cm³
Finish: Surface area (cm²) × 0.02 min/cm²

Quick Estimates - OD Turning:

Part SizeRoughFinishTotal
Ø25 × 50mm0.5 min0.3 min0.8 min
Ø50 × 100mm2 min1 min3 min
Ø100 × 150mm6 min2.5 min8.5 min
Ø150 × 200mm12 min4 min16 min
ID Boring
Multiply OD time × 1.5 (slower, less rigid)
Deep bores (L/D > 4): × 2.0
Threading
Single-point: 0.3 min per 25mm thread length (standard pitch)
Thread milling: 0.5 min per thread
Tapping: 0.1 min per hole (standard)
Grooving/Parting
Grooving: 0.2 min per groove
Part-off: Diameter (mm) × 0.01 min
Milling Operations
Face Milling
Time = (Area / (Width of Cut × Feed Rate)) + Approach

Quick: Area (cm²) × 0.02 min/cm² for roughing
       Area (cm²) × 0.01 min/cm² for finishing
Pocket Milling
Volume (cm³) × 0.8 min/cm³ (aluminium)
Volume (cm³) × 1.5 min/cm³ (steel)
Volume (cm³) × 3.0 min/cm³ (stainless/titanium)

Add 50% for finishing passes
Drilling
Standard drill: Depth (mm) × 0.02 min/mm
Peck drilling: Depth (mm) × 0.04 min/mm
Deep hole (>5xD): Depth (mm) × 0.08 min/mm
5-Axis Contouring
Surface area (cm²) × 0.15 min/cm² (aluminium)
Surface area (cm²) × 0.3 min/cm² (steel)
Surface area (cm²) × 0.5 min/cm² (titanium)

Complex surfaces: Add 50-100%
Swiss Operations
Small precision parts (Ø3-10mm):
- Simple: 30-60 sec/part
- Standard: 60-120 sec/part
- Complex: 120-300 sec/part

Medium parts (Ø10-25mm):
- Simple: 60-120 sec/part
- Standard: 120-240 sec/part
- Complex: 240-480 sec/part
EDM Operations
Wire EDM
Cut length (mm) × thickness (mm) × 0.003 min/mm² (roughing)
Add 50% per skim pass (typically 2-4 skim passes)

Example: 100mm perimeter × 25mm thick
- Rough: 100 × 25 × 0.003 = 7.5 min
- 3 skims: 7.5 × 1.5 × 1.5 × 1.5 = 25 min total
Spark EDM
Volume to remove (cm³) × 30-60 min/cm³
Roughing faster, finishing much slower
Electrode making: Add 1-4 hours depending on complexity

Setup Time Estimates

Operation TypeFirst SetupRepeat Setup
Simple turning30 min15 min
Complex turning (live tooling)60 min30 min
Swiss90 min45 min
3-axis milling30 min15 min
4-axis milling45 min20 min
5-axis milling60-90 min30 min
Wire EDM30 min15 min
Spark EDM60 min + electrode30 min
Multiple operationsSum of eachSum × 0.7

Quick Quote Formula

Total Cost = (Setup Cost) + (Run Cost × Quantity) + (Material Cost) + (Secondary Ops)

Where:
- Setup Cost = Setup Time × Hourly Rate
- Run Cost = Cycle Time × Hourly Rate × Material Factor × Tolerance Factor
- Material Cost = Weight × £/kg × Waste Factor (typically 1.3-1.5)
- Secondary Ops = Finishing, heat treat, plating, inspection (get quotes)
Quantity Breaks
QuantityMultiplierNotes
1-51.5Prototype pricing
6-251.2Small batch
26-1001.0Standard
101-5000.9Efficiency gains
500+0.8Volume pricing

Estimation Workflow

Step 1: Feasibility (Use PlantCapability)
  • Can we make it?
  • Which machine?
  • Any showstoppers?
Step 2: Operation Breakdown
| Op# | Description | Machine | Setup | Cycle |
|-----|-------------|---------|-------|-------|
| 10 | | | min | min |
| 20 | | | min | min |
| 30 | | | min | min |
Step 3: Apply Factors
Base cycle time: X min
× Material factor (Y): X × Y = Z min
× Tolerance factor (T): Z × T = A min
× Complexity factor (C): A × C = B min
Adjusted cycle time: B min
Step 4: Calculate Costs
Setup: [time] × £[rate] = £____
Run: [cycle] × [qty] × £[rate/60] = £____
Material: [weight] × £[per kg] × 1.3 = £____
Secondary: £____
Subtotal: £____
Margin (25-40%): £____
**Quote: £____**

Quote Output Template

# ROUGH QUOTE ESTIMATE

**Date:** YYYY-MM-DD
**Customer:**
**Part:**
**Quantity:**

---

## Part Summary
- Material:
- Envelope: L × W × H mm
- Weight (est): kg
- Key tolerances:
- Surface finish:

## Feasibility
- [x] Within capability
- Machine(s):
- Risks:

---

## Operations Breakdown

| Op | Description | Machine | Setup (min) | Cycle (min) |
|----|-------------|---------|-------------|-------------|
| 10 | | | | |
| 20 | | | | |
| 30 | | | | |
| **Total** | | | **X** | **Y** |

---

## Factors Applied

| Factor | Value | Reasoning |
|--------|-------|-----------|
| Material | × | |
| Tolerance | × | |
| Complexity | × | |
| **Combined** | **×** | |

**Adjusted cycle:** Y × [combined] = Z min/part

---

## Cost Calculation

| Item | Calculation | Cost |
|------|-------------|------|
| Setup | X min × £[rate]/60 | £ |
| Run (× qty) | Z min × [qty] × £[rate]/60 | £ |
| Material | [wt] × £[/kg] × [qty] × 1.3 | £ |
| Secondary ops | [detail] | £ |
| **Subtotal** | | **£** |
| Margin ([%]) | | £ |
| **Quote Total** | | **£** |

**Per Part:** £ each at qty [X]

---

## Assumptions & Exclusions

### Assumptions
-

### Exclusions
-

### Validity
- Quote valid for: 30 days
- Lead time estimate: X weeks

---

## Notes

### Risks
-

### Alternatives
-

---

*Rough estimate only. Final quote subject to drawing review and process planning.*

Quick Reference Tables

Cycle Time Rules of Thumb
Part TypeQuick Estimate
Simple turned (Ø25-50)2-5 min
Complex turned (Ø50-100)8-20 min
Swiss part (small)1-3 min
Simple prismatic (milled)5-15 min
5-axis component20-60 min
Wire EDM profile30-120 min
Setup Time Rules of Thumb
ScenarioEstimate
Repeat job, tooling available15-30 min
New job, simple30-45 min
New job, complex60-120 min
New job, 5-axis or Swiss90-180 min
Cost Sanity Checks
Part Type£/part Range (qty 100)
Simple turned bushing£2-8
Complex turned shaft£15-50
Swiss precision pin£3-15
Milled bracket (aluminium)£10-40
5-axis aerospace part£50-500
EDM detail£30-200

Examples

Example 1: Turned Shaft

Part: Ø50 × 150mm shaft, 4140 steel, ±0.025mm on bearing diameters Qty: 100

Operations:
- OP10: Face, turn OD, drill center (NLX2500)
- OP20: Flip, face to length, finish bearing seats

Cycle estimate:
- Rough turning: 4 min
- Finish turning: 2 min
- Total: 6 min base

Factors:
- Material (4140): × 1.1
- Tolerance (±0.025): × 1.4
- Complexity (standard): × 1.0
- Combined: × 1.54

Adjusted cycle: 6 × 1.54 = 9.2 min

Costs (at £65/hr):
- Setup: 45 min × £65/60 = £49
- Run: 9.2 min × 100 × £65/60 = £997
- Material: 2.3kg × £3/kg × 100 × 1.3 = £897
- Subtotal: £1,943
- Margin (30%): £583
- Quote: £2,526 (£25.26/part)
Example 2: Swiss Medical Pin

Part: Ø4 × 20mm pin, 316SS, ±0.01mm, qty 1000 Machine: CITIZEN LFV

Cycle estimate: 90 sec base (complex small part)

Factors:
- Material (316SS): × 1.4
- Tolerance (±0.01): × 1.5
- Complexity (moderate): × 1.3
- Combined: × 2.73

Adjusted cycle: 90 × 2.73 = 246 sec = 4.1 min

Costs (at £85/hr):
- Setup: 90 min × £85/60 = £128
- Run: 4.1 min × 1000 × £85/60 = £5,808
- Material: 0.02kg × £8/kg × 1000 × 1.3 = £208
- Subtotal: £6,144
- Margin (30%): £1,843
- Quote: £7,987 (£7.99/part)

Workflow Routing

TriggerAction
"quote", "estimate", "pricing", "how much to make"Run full estimation workflow (Steps 1-4)
"cycle time", "how long to make"Run cycle time estimation only (Steps 1-3)
"rough quote", "ballpark", "sanity check"Use quick reference tables for rapid ROM estimate
"feasibility", "can we make"Defer to PlantCapability skill first
"cost per part at qty X"Apply quantity break multipliers to base cost

Integration

  • PlantCapability: Check feasibility before estimating
  • CNCSetup: Setup times based on actual setup sheet complexity
  • TribalKnowledge: Adjust factors based on captured experience
  • AutomotiveManufacturing: Link to PPAP/APQP costing requirements

Comments