R
risk-metrics-calculation
About risk-metrics-calculation
risk-metrics-calculation is a risk measurement skill for portfolio management. It covers metrics such as VaR, Expected Shortfall, and drawdown, with guidance on practical risk analysis.
Key features
- 01Volatility and tail-risk metrics
- 02VaR and CVaR analysis
- 03Maximum drawdown and risk-adjusted returns
- 04Risk assessment across time horizons
- 05Stress testing and rolling analysis
Use cases
- 01Measure portfolio risk
- 02Set risk limits and position sizes
- 03Build risk dashboards
- 04Calculate risk-adjusted returns and support regulatory reporting
Install
Copy the command and run it in a terminal.
$
npx skills add https:/ / github.com/ wshobson/ agents --skill risk-metrics-calculationAfter installing, type/risk-metrics-calculationin Claude Code to confirm it loaded.
Bundled filesreferences/details.md
Details
From the project READMERisk Metrics Calculation
Comprehensive risk measurement toolkit for portfolio management, including Value at Risk, Expected Shortfall, and drawdown analysis.
When to Use This Skill
- Measuring portfolio risk
- Implementing risk limits
- Building risk dashboards
- Calculating risk-adjusted returns
- Setting position sizes
- Regulatory reporting
Core Concepts
1. Risk Metric Categories
| Category | Metrics | Use Case |
|---|---|---|
| Volatility | Std Dev, Beta | General risk |
| Tail Risk | VaR, CVaR | Extreme losses |
| Drawdown | Max DD, Calmar | Capital preservation |
| Risk-Adjusted | Sharpe, Sortino | Performance |
2. Time Horizons
Intraday: Minute/hourly VaR for day traders
Daily: Standard risk reporting
Weekly: Rebalancing decisions
Monthly: Performance attribution
Annual: Strategic allocation
Detailed patterns and worked examples
Detailed pattern documentation lives in references/details.md. Read that file when the navigation tier above is insufficient.
Best Practices
Do's
- Use multiple metrics - No single metric captures all risk
- Consider tail risk - VaR isn't enough, use CVaR
- Rolling analysis - Risk changes over time
- Stress test - Historical and hypothetical
- Document assumptions - Distribution, lookback, etc.
Don'ts
- Don't rely on VaR alone - Underestimates tail risk
- Don't assume normality - Returns are fat-tailed
- Don't ignore correlation - Increases in stress
- Don't use short lookbacks - Miss regime changes
- Don't forget transaction costs - Affects realized risk
Comments
Markdown supported