task-estimator is a Claude Code skill for developers who want task estimates grounded in their recorded work history. It maintains a task ledger, estimates from similar past tasks, and evaluates its own quotes for calibration.

Key features

  1. 01Ledger of chats, tasks, and estimates
  2. 02Estimates from similar recorded tasks
  3. 03Records completed work and outcomes
  4. 04Scores estimate accuracy
  5. 05Recalibrates estimates from ledger data

Use cases

  1. 01Estimate a task using past project work
  2. 02Record actual effort after completing a task
  3. 03Check whether previous estimates were accurate

Install

Copy the command and run it in a terminal.

$npx skills add https://github.com/marks97/task-estimator --skill task-estimator

After installing, type/task-estimatorin Claude Code to confirm it loaded.

Bundled files

References and scripts installed along with SKILL.md.

README.md
prompts/
audit-task.md
classify-chat.md
estimate-features.md
references/
ai-era-evidence.md
estimation-science.md
measurement-model.md
scripts/
audit.mjs
backfill.mjs
calibrate.mjs
classify.mjs
digest.mjs
extract.mjs
lib.mjs
record.mjs
score.mjs
slice.mjs
stitch.mjs
templates/
claude-md-snippet.md

Details

From the project README

Task estimator

Estimates from your measured history, not from the model's intuition about how hard something looks. The model's intuition is the thing that is broken: developers using AI tools believed they were 20% faster while measuring 19% slower (METR 2025). An estimate that is not anchored to recorded actuals just reproduces that gap in writing.

So this skill does three things: it keeps a ledger of what tasks actually cost, it quotes new tasks against the empirical distribution of similar past tasks, and it scores its own past quotes so the bias is visible.

Depth on the evidence is in references/: estimation-science.md (the classical results — EBS, reference classes, anchoring, flow metrics), ai-era-evidence.md (what changed once an agent was in the loop), measurement-model.md (the phase taxonomy, the measured constants, and the calibration math the scripts implement). Read them when a rule here looks arbitrary — every rule traces to a result there. Do not re-derive the theory during an estimate; execute the steps.

Pick a mode

The user is doing thisMode
Asking how long something will take, ETA, sizing, "is this a day?"estimate (default)
First run, no $LEDGER (see Ledger layout), "set this up", "calibrate me", "backfill"setup
"record this task", "log this", finished a task, the CLAUDE.md hook firedrecord — record.mjs
"re-run calibration", "how good are your estimates", "were you right", "recalibrate"recalibrate — calibrate.mjs + score.mjs

The four modes are one loop, and it only closes if every leg runs: estimate logs a quote → record measures the actual and scores it against that quote → recalibrate reports whether the quotes are any good → the next estimate corrects for it. Skipping the log in estimate mode, or never running record mode, leaves the skill quoting from history forever without ever learning whether its own quotes were right.

If $LEDGER/calibration.json does not exist and the user asks for an estimate, say so and offer setup — then still give a prior-only estimate if they want one now. Never silently estimate off an empty ledger.

Ledger layout

$LEDGER resolves in this order, first hit wins:

  1. $CLAUDE_ESTIMATION_DIR — explicit override.
  2. ~/.claude/estimation — the portable default.

The ledger lives outside the skill directory so it survives reinstalls, and outside any per-account config dir so it is one history, not one per account.

$LEDGER/
  ledger/
    chats.ndjson       # one row per Claude Code conversation (mined)
    tasks.ndjson       # one row per unit of work; the reference class lives here
    estimates.ndjson   # one row per quote this skill emitted, for scoring
  calibration.json     # population priors + per-class empirical quantiles

Scripts ($SKILL/scripts/). The four primitives are pure and stdout-oriented: extract.mjs (transcript JSONL → one chat row), stitch.mjs (chats → tasks), digest.mjs (one chat → compact text for an LLM pass), calibrate.mjs (ledger → calibration.json). slice.mjs sits between the last two: it cuts each epic's chats into labelled sub-deliverables (task.sub_tasks[]) without ever splitting the epic row.

Two more close the loop, and they are the ones record and recalibrate run: record.mjs (one finished session → extract → stitch → rework-merge → outcome → score, appended to the ledger) and score.mjs (estimates × tasks → how good the quotes were). Note the division of labour, because the two calibrations answer different questions and get confused constantly:

QuestionReadsWrites
calibrate.mjshow long do tasks like this take?tasks.ndjsoncalibration.json
score.mjswere my quotes any good?estimates.ndjson + tasks.ndjsonnothing

calibrate.mjs is what an estimate quotes from. score.mjs is what tells you the quotes are systematically low. A ledger with no estimates.ndjson rows can do the first forever and never the second — which is the failure this loop exists to stop.

estimates.ndjson — the row schema

One row per quote, written by estimate step 8, read by record.mjs and score.mjs. schema: "estimate.v1":

{"schema":"estimate.v1",
 "estimate_id":"2026-08-31-add-oauth-provider",
 "date":"2026-08-31",
 "task":"add-oauth-provider",
 "ticket":null,
 "task_desc_hash":null,
 "features":{"type":"feature-epic","novelty":"adaptation","precedent":"saml-provider"},
 "class":{"neighbors":["example-api/TICKET-3880"],"n":1,"gate":"prior-only"},
 "quoted":{"agent_hours":{"p50":76,"lo":50,"hi":150},
           "human_rounds":{"p50":null,"lo":600,"hi":1000},
           "calendar_days":{"p50":null,"lo":28,"hi":49}},
 "source":"ledger-neighbor+bounded-adjustment"}

Field rules, each of which exists because breaking it makes the row unscorable:

  • estimate_id is the join key record.mjs --estimate-id takes. Default it to <date>-<task>. Once a task is recorded against it, the id is written back onto the task row as estimate_id, so the link is never re-guessed.
  • task is a slug, and it must be one record.mjs can find later: the ticket key, the branch name, or the phrase the classifier will summarise the work as. Matching runs estimate_id → ticket → task_desc_hash → task_id slug → summary → epic-slice slug → sub-deliverable slug, first hit wins. A quote that matched an epic slice is scored against that slice's hours, not the epic's — scoring "the webhook part" against a 76-hour integration would report a 60× miss on a quote that was never about the integration. score.mjs names the slice in sub_task when it does this.
  • quoted carries the three axes the ledger measures — agent_hours, human_rounds, calendar_days — and no others. A band quoted in weeks is stored in days. Quote something on every axis you can: an axis with no band is silently unscorable, which is how an estimator ends up with a coverage number built from one axis.
  • lo/hi are the band you actually committed to (the P50→P85 span, or the regime-split range). score.mjs scores coverage at 80% nominal against them.
  • p50 may be null, and then score.mjs uses the band's log midpoint (sqrt(lo*hi)) and flags every ratio derived from it — so a derived centre is never mistaken for something you said.
  • task_desc_hash — sha256 of the anchor-stripped description. Optional but preferred when there is no ticket: it keeps prose out of the ledger while still matching later.

Legacy rows (the pre-schema hand-written shape: agent_h_p50, agent_h_band, rounds_band, calendar_weeks_band) are normalised on read and still score. Write new rows in the canonical shape.

Not every real string is a real join signal. stitch.mjs denies generic branches (main is on every chat that ever pushed) and, for the same reason, unattested ticket keys: a dated report filename pasted into a review round yielded REPORT-2026 and welded 46 chats and 79 agent-hours into one "task". A key only becomes a stitch edge if it is below the load-bearing fan-out, or its prefix appears in a feature branch, or its namespace is live — several sibling keys that also turn up apart from it, since co-pasted fragments always travel together and real tickets do not. The rules and their evidence are in the comments on isPlausibleTicketKey (extract.mjs) and eligibleTicketKeys (stitch.mjs).

Three drivers run a whole corpus and are resumable — re-running one continues, it never restarts: backfill.mjs (walk a transcripts root → chats.ndjson + tasks.ndjson), classify.mjs (haiku → classifications.ndjson, merged into tasks.ndjson), audit.mjs (stratified sonnet re-judgement → audit.ndjson + per-field agreement).

Mode: estimate

The order below is mandatory. Each step exists to stop a specific failure. Do not reorder, do not skip ahead to "well, this looks like about a day".

1. Strip the anchors — before any reasoning

Read the task description. Before you think about duration at all, remove from consideration: stated deadlines, target dates, story points, "should be quick / small / huge / trivial", the user's own guess, a client's promised date, a ticket estimate field.

An irrelevant number in the prompt shifts estimates by 4–5×, and the effect survives being told to ignore it and survives coming from an obviously unqualified source. You cannot un-see an anchor, so handle it explicitly: if the ask contained one, say "noting you said ~X — the number below is history-derived and was computed before reading it" and never let it move the quantile.

2. Readiness gate — refuse to estimate unready work

Do not produce an estimate if either is true:

  • No testable acceptance criteria. Nobody can say what "done" is, in a way a test or a concrete observation could settle.
  • No converged implementation strategy. Two or more materially different approaches are still live, and the choice changes the work by more than one bucket.

These are exactly the tasks that explode: the distribution is bimodal — ~78% of "easy" tasks land near their class median, and the other ~22% overrun by more than 180%, and the overrunners are overwhelmingly the ones that failed this gate.

Output instead:

Not estimable yet — recommend a timeboxed spike. Missing: <the specific criterion or the unresolved fork>. Timebox: <1 bucket on the ladder>, and the deliverable of the spike is the missing thing, not the feature. Re-run the estimate after the spike; it will be a different (and much tighter) class.

Recommending a spike is a real answer. Producing a number for an unspecified task is not.

3. Extract features

Follow prompts/estimate-features.md. It is a checklist with the actual commands to run — do the searches, do not guess the answers. It yields:

repos[], task_type (bugfix|feature|refactor|migration|infra|investigation|script), greenfield|brownfield, precedent_in_repo (did we ship this shape here before — find it or state none), self_verifiable (tests|typecheck-only|human-eyes|prod-only), blast_radius (grep-counted files likely touched), external_deps[] (third-party approvals, other humans, deploys), parallelizable (across files/repos).

Precedent and self-verifiability do the most work of any features in the set. Spend the searches on them.

Then place the task in the speedup quadrant, because the agent discount is not a scalar:

SimpleComplex
Greenfield+30–40%+10–15%
Brownfield+15–20%0–10%, sometimes negative

Most work in a mature repo is bottom-right, where the discount is near zero and can invert. Record the quadrant; step 6 uses it.

4. Retrieve the reference class

From $LEDGER/ledger/tasks.ndjson, in this order:

  1. k = 1–3 nearest neighbours on the feature vector. Small k on purpose — larger k regresses to the mean and destroys what made analogy work.
  2. If the tight class has n < 5, widen to the whole task_type class and say you widened.
  3. If still thin, fall back to the population priors in calibration.json and say the estimate is prior-based.

Check field_reliability before you lean on a field, and say what you find. Every field in it is either reliable: true or reliable: false with a measured agreement rate — there is no unmeasured field. As of the 2026-09-01 audit task_type is the one that fails (0.38 raw / 0.43 admissible, n=58 stride), so widening to the task_type class is the weakest move in this list and must be stated as such: prefer the k=1–3 neighbours, and when you do widen, say the class label itself agreed with a stronger judge only ~4 times in 10. It agrees 0.51 on well-stitched rows, so the fault is largely the 26% of rows that are over-merged rather than the label.

Always record which class you landed in and its n. Report the variance across the neighbours, not just the centre: 1h/1h/9h and 3h/3h/4h centre in the same place and mean completely different things.

When the ask is a slice of a bigger piece of work, use the epic-slice class instead. calibration.json carries reference_classes["epic-slice"] (with its own by_task_type), built by slice.mjs from the sub-deliverables of every task with ≥6 chats. Reach for it when the question is "how long is the webhook part of the payments integration" rather than "how long is the payments integration" — a slice inherits an epic's already-loaded context, its branch and its conventions, so it is not the same animal as a standalone task of the same task_type. Say which of the two classes you quoted; they answer different questions and the epic row remains the unit of record for both.

With no usable class at all, size the human-rounds axis from the constant-hazard model rather than from feel: an agent's 80%-reliability horizon is ~30 minutes of human-equivalent work, so human_rounds ≈ ceil(human_equivalent_minutes / 30). Sanity band: real sessions run 3.3–5.4 interventions. A prior-only quote landing outside that band needs a reason.

5. Compute empirical quantiles — never a fit, never a mean

Sort the class's actuals and take the quantiles directly off the observed values, in log space. Do not fit a lognormal (or anything else) and read quantiles off the curve: the fit systematically understates the tail, which is the only part of the distribution anyone is actually asking about. Do not quote a mean; on a fat-tailed class the mean is neither the typical case nor the risk.

Check your own bias before quoting. Run node $SKILL/scripts/score.mjs and read the per-axis line: it is the only evidence about this estimator rather than about the tasks.

  • If it prints TOO EARLY TO CALL (fewer than 5 scored pairs), quote the class straight and say the estimator itself is unvalidated. Do not apply a correction derived from one or two points — a single ratio is an observation, not a bias.
  • Once it reports a geometric mean ratio over n ≥ 5, prefer EBS ratio resampling: draw whole historical estimate/actual ratios with replacement (100+ draws) and divide the class centre by each draw. Same principle — whole observed values, resampled, never averaged. Note this in source on the logged row so the provenance survives.

Sample gates. State which one you are at, every time:

n in classYou may quote
< 5Nothing from the class. Prior-only, and say so explicitly.
5–9P50 only, with a warning that there is no usable upper bound yet.
10–19P85.
≥ 20P95 allowed.

Below n ≈ 20 the class quantile is also shrunk toward the population prior by w = n/(n+κ) — a personal P85 at n=11 spans 0.31–2.26× of the truth, so it is worth something as an adjustment and nothing on its own. calibrate.mjs emits the shrunk value; use it, do not recompute the raw quantile and quote that instead.

15 fresh points beat 150 stale ones. calibrate.mjs already applies a 90-day half-life — do not re-weight by hand.

6. Inside-view adjustment — at most one bucket

The log ladder: ≈15m · 1h · 3h · 1d · 3d · 1w+.

You may move the class result by at most one bucket, and only while naming the specific evidence: "the identical Prisma migration shipped twice this month, both under 2h". Unnamed intuition ("this feels simpler") buys zero adjustment. Two buckets is not an adjustment, it is a different class — go back to step 4.

Then apply the quadrant discount from step 3 — and widen the interval when you do, never narrow it. Speedup and variance move together: the quadrants with the biggest expected gains also have the widest spread. "The agent will handle it" is a reason for a wider band, not a tighter one.

Budget the failure branch longer than the success branch. Failed trajectories run 18–82% longer than successful ones; failure is expensive and late, not cheap and early.

Default to the class P85. Dropping to P50 requires naming the mitigation that removed the tail: spec frozen, harness exists, no external dependency, precedent in this repo.

7. Output — the SLE, three axes, never a single number
**85% of your similar tasks finished in ≤ X agent-hours, ≤ Y human rounds, Z calendar days**
(class: <description>, n=<N>, neighbors: <task ids>)

Then, in this order:

  • P50 line — "half finished in ≤ …", so the typical case is visible next to the limit.
  • Regime call — the distribution is bimodal, not a spread around a centre. Say which mode you think this is in and why: agent-nails-it (precedent exists, tests verify, narrow blast radius) or integration-thrash (verification is human-eyes or prod-only, no precedent, external surface). Where both are live, give both with rough weights. A single blended number sits in the trough between the modes and describes almost nothing.
  • Blow-up risk flags, each named, only the ones that apply: vague spec · human-eyes-only verification · wide blast radius · external waits · no precedent in repo. Name the flag and the specific thing that triggered it.
  • External calendar waits, listed separately. App review, a platform approval, someone else's deploy window, a human decision. This is dead time, not work — never fold it into agent-hours; it is why calendar days and agent-hours are separate axes.
  • The review tail is part of calendar days. If done means merged, the estimate does not stop at "code written" — that is the part that got faster. Review time is up 441% and agent-authored PRs wait 5.3× longer for pickup. Include the wait for a reviewer explicitly whenever the task ends in a PR someone else must merge.
  • "Split this" whenever the estimate exceeds the class P85. Right-sizing beats budgeting more. Propose the actual split into ≤1-bucket pieces, do not just advise it.

Never emit a single number. A point estimate on a fat-tailed class is a category error, and it is the format that makes people commit to dates they then miss.

8. Log the quote — not optional, and not later

An estimate that was never logged can never be scored. This is the step that makes the skill improve instead of repeating itself, and it is the one that gets skipped because the user already has their answer. Do it in the same turn you quote.

Append one estimate.v1 row to $LEDGER/ledger/estimates.ndjson — schema and field rules are in Ledger layout; the three axes and a task slug record.mjs can find again are the load-bearing parts:

LEDGER=${CLAUDE_ESTIMATION_DIR:-~/.claude/estimation}
cat >> $LEDGER/ledger/estimates.ndjson <<'EOF'
{"schema":"estimate.v1","estimate_id":"2026-09-01-csv-export","date":"2026-09-01","task":"TICKET-1234","ticket":"TICKET-1234","features":{"task_type":"feature","greenfield":false,"precedent_in_repo":"example-api/TICKET-1180","self_verifiable":"tests","blast_radius":9},"class":{"neighbors":["example-api/TICKET-1180","example-api/TICKET-1204"],"n":7,"gate":"p50-only"},"quoted":{"agent_hours":{"p50":3,"lo":1.5,"hi":9},"human_rounds":{"p50":12,"lo":6,"hi":30},"calendar_days":{"p50":1,"lo":1,"hi":4}},"source":"class-p50+one-bucket-precedent-adjustment"}
EOF

Then close the estimate by telling the user the loop is armed, in one line: "logged as 2026-09-01-csv-export — run record mode when it lands and it scores itself."

Two rules about the numbers in that row:

  • Log what you told the user, not a hedged version. A band quietly widened in the ledger manufactures coverage the estimator never earned.
  • Never edit a logged row once work has started. A quote revised with knowledge of the outcome is not a quote. Log a second row and let both score.

Store the hash, not the text — the ledger stays free of task prose, and record mode matches on it later to score ratio (actual/quoted) and interval coverage.

Doctrine — state this when the shape of the estimate is questioned

duration ≈ rounds × (per-round agent time + per-round human wait)

Human round count is the dominant predictor (r ≈ 0.83 on measured data). First-turn duration predicts nothing (r ≈ 0.0).

So a task that one-shots in 40 minutes and a task that takes eight rounds of "not quite, try again" are not comparable, however similar the diff looks. Estimate the rounds; the minutes follow. And the per-round human wait is the user's own latency — it is in the recorded actuals already, do not model it separately.

Two corollaries worth saying out loud when they apply:

  • A long first turn is a good sign, not a bad one. It predicts fewer rounds — front-loaded framing pays for itself. Never quote a task as slow because it started slow.
  • Waiting for permission prompts is the largest recoverable loss. Approval gaps are 52% of long intra-task pauses, median 32 minutes each. If the user's setup asks for approval per tool call, that — not model speed — is what is costing them the afternoon.

Estimate rounds and steps, never lines. Assistant steps correlate with duration at r ≈ 0.86 and human rounds at r ≈ 0.82; LOC manages only 0.53. A diff-size estimate is a worse predictor than the thing it feels more concrete than.

Never accept self-reported speedups as calibration input. "That took me 20 minutes" is not data; it is the perception gap talking. Only mined actuals go in the ledger.

Mode: setup

1. Structure

Check $LEDGER (resolution order in Ledger layout). Create ledger/, empty chats.ndjson / tasks.ndjson / estimates.ndjson, and a placeholder calibration.json. Do not overwrite anything that exists — if the ledger already has rows, you are in recalibrate, not setup.

2. Consent — before touching any transcript

Stop and ask with AskUserQuestion. Do not read a single transcript before an answer. Explain exactly this:

  • It reads Claude Code conversation JSONL under ~/.claude*/projects/ (both accounts) from this machine only.
  • Nothing leaves the machine except the classification calls, which go to the Anthropic API as claude -p — the same place the user's normal sessions already go.
  • What gets stored: task shape and durations. Not the conversation text.
  • It is reversible: rm -rf ~/.claude/estimation.

Offer to scope it: all projects, one project, or the last N months.

3. Backfill — deterministic pass

One command over the whole transcripts root — it walks every project dir, extracts each .jsonl sequentially (never parallel: these files run to 140 MB and this is a live box), and stitches globally at the end:

nice -n 19 ionice -c3 node --max-old-space-size=2048 $SKILL/scripts/backfill.mjs \
  --root ~/.claude/projects

It skips transcripts under 5 KB as noise (consent probes, sessions that never got past the banner) and counts them; it skips any chat whose file and sidecar directory are both unchanged since the last run. Interrupt it and re-run — chats are appended as they are extracted.

Scratch and its progress log go in /tmp/claude/task-estimator-backfill/, never in a repo and never in the ledger.

Subagent sidecars are mined too, and they are where the delegated work is. Next to <chat_id>.jsonl the harness writes <chat_id>/subagents/agent-*.jsonl plus a .meta.json naming each agent's type. extract.mjs runs the same extraction core over each one and folds the result into the parent chat's subagents object — loc_added/loc_removed, files_edited, repos, active_min, sidecar_count and a per_type breakdown. This is not an optional refinement: a Task/Agent tool_result in this Claude Code era carries no toolStats, so a chat that delegated everything reads as zero LOC without it, and the parent does not even persist every spawn (one 104-spawn sprint kept two). Two rules hold absolutely:

  • Nothing folds into the parent's own fields. A subagent's minutes run inside its parent's wall clock, so adding them would count time that was spent once, twice. The chat's loc_added, files_edited and agent_active_min never move.
  • Nothing is counted twice inside subagents either. Where the parent did report toolStats for a spawn and a sidecar for that same toolUseId exists, the sidecar measurement replaces the reported one — it is the primary record. Spawns with no sidecar keep their reported numbers. Depth-2 agents (spawned by another subagent, so no tool_use block exists in the parent at all) are added, which is why subagents.count can exceed the number of spawn blocks.

Sidecars are never emitted as chats of their own.

Every chat also gets a repo_share — {repo: fraction}, summing to exactly 1, splitting its minutes across repos in proportion to the files edited there (parent edits plus subagent edits). Chats that edited nothing attribute wholly to their cwd repo, or to the workspace when the cwd is a multi-repo root. stitch.mjs rolls this into agent_hours_by_repo / subagent_hours_by_repo on the task row. Use those for any per-repo or per-area question. Summing agent_hours over repos instead counts every multi-repo chat once per repo — on this corpus that inflated an area roll-up ~25x.

Probe sessions get a noise flag — "permtest" (a permission probe: echo PERMTEST_OK, "testing perms here") or "qa-probe" (a session run out of a /tmp scratch tree). Detection is ratio-based, not keyword-based, because real chats discuss permission probes at length; a chat is a probe only when probing is essentially all it did. The rows stay in the ledger and calibrate.mjs drops them from the quantiles.

4. Backfill — semantic pass

One classification per chat: digest.mjs → haiku. Before running, count the chats, estimate the token spend, print it, and ask to proceed. A backfill over a year of transcripts is not free and the user gets to see the number first — --estimate-only prints exactly that and does nothing else.

node $SKILL/scripts/classify.mjs --estimate-only      # count + token/cost/wall estimate
node $SKILL/scripts/classify.mjs --concurrency 3      # then, once they agree

classify.mjs drives this call per chat, with MAX_THINKING_TOKENS=0 (measured: 6.5 s and $0.007 per call against 44 s and $0.025 with thinking, no loss against the prompt's rules — the audit stage is what keeps that honest):

node $SKILL/scripts/digest.mjs --chat <chat-id> \
  | claude -p --model claude-haiku-4-5 \
      --output-format json \
      --system-prompt "$(cat $SKILL/prompts/classify-chat.md)" \
      --tools "" --safe-mode --no-session-persistence \
  | jq -r '.result'

Every flag is load-bearing:

  • --tools "" — no tool loop. It is a classifier, it reads text and returns JSON.
  • --safe-mode — no CLAUDE.md, skills, hooks, MCP servers. Keeps the classifier uncontaminated by project instructions and keeps the prompt prefix stable, so the batch gets prompt-cache hits. Auth still works normally (unlike --bare).
  • --no-session-persistence — critical. Without it every classification writes a new JSONL into ~/.claude*/projects/, which the next backfill would mine as a chat. The ledger would start eating its own tail.
  • --output-format json returns an envelope; the model's text is .result, and it may still arrive fenced. Strip ``` fences before parsing. Optionally harden with --json-schema using the Schema block from the prompt file.

Merge the returned fields into the task row, plus classified_at and classifier_model. A task has several chats, so merging has rules:

  • Labels come from the main chat — the classification that called itself main, tie-broken by agent-active minutes. Labels do not vote: averaging a bugfix and a refactor produces neither.
  • outcome is decided by the artifact, not by the classifier. A task with commits > 0 or a non-empty prs is shipped, full stop — those fields come from git and gh output, not from a model reading a truncated digest, and they are exactly the standard done means merged sets. The classifier keeps only the two verdicts an artifact cannot express: shipped-then-reverted and abandoned (in both, the commit exists and something else happened). outcome_source records deterministic or classifier and classifier_outcome keeps the original, so an audit can still score the model. This exists because the classifier ran 2.3:1 too pessimistic — a sonnet audit moved 62 rows unknown → shipped against 27 the other way, all of it the "prefer unknown over a guess" rule firing on a digest that simply did not show the commit line.
  • external_waits and user_touchpoint_kinds are unioned over every chat. They are a quantity and a set, not labels — a wait that happened in chat 3 is still dead time the task paid for.
  • Epics stay merged, and keep their detail. A multi-chat task is one row (splitting it is exactly the under-merging that makes a ledger flatter itself), with every chat's own labels preserved in a sub_deliverables[] array. A single chat that reports several units of work contributes several entries too.

Batch and resume. Process in batches, write after each, and skip any task that already has classified_at. An interrupted backfill must be resumable by re-running the same command, not by starting over.

5. Audit — is the classifier trustworthy?

Take a stratified 1-in-5 sample, oversampling: the biggest tasks, rows with low stitch_confidence, and rows where haiku contradicts the deterministic signals (says shipped with no commit; says abandoned with a merged PR).

Re-judge each with sonnet and prompts/audit-task.md. audit.mjs does the stratification (the three strata in full, the remainder on a deterministic 1-in-rate stride, so a re-run audits the same rows), feeds the judge the task record plus its chats' digests, and prints the per-field agreement:

node $SKILL/scripts/audit.mjs --plan-only     # what would be sampled, and why
node $SKILL/scripts/audit.mjs --rate 5

Report the per-field agreement rate. If any field agrees < 80%, flag that field: say the prompt needs revision, and mark the field unreliable in calibration.json rather than quietly using it in the feature vector. A classifier nobody checked is not evidence.

Two things to read carefully in that table:

  • The rate is reported on the stride stratum only. The other three strata are deliberately the hardest rows, so their agreement is not a population rate.
  • outcome is scored on the value the ledger actually holds, which for a row with an artifact is the deterministic one. That is the right number for "can I trust this field", but it is not a measurement of the classifier — classifier_outcome is what to score the model against.

An auditor correction only counts if the auditor was entitled to make it. Three kinds are inadmissible and calibrate.mjs discounts all three from the adjusted rate — which is the rate reliable is decided on, since an inadmissible correction must not be able to condemn a field. When they are both the majority of the disagreements and at least two in number, the field is reported unmeasured rather than unreliable: that is a defect in prompts/audit-task.md, not in the data, so fix the prompt and re-audit before believing either number.

  • off_spec_corrections — a value outside the field's own enum. A "correction" in a different vocabulary is a different question answered.
  • corrections_contradicting_deterministic_fields — outcome → unknown on a row whose commits/prs came out of git. The judge sees at most six truncated digests; the record is the census and the digest is a sample, so "I did not see the commit" is not a finding.
  • self_contradicting_corrections — a false whose correction repeats the value already in the record. It asserts a disagreement and then fails to name one.

Read the stitch verdict beside the label rates, because it explains most of what is left of them. field_reliability.stitch reports the verdict distribution and over_merged_share, and every field also carries agreement_on_well_stitched_rows — the same rate over the rows the auditor called correct. Measured here: task_type agrees 0.51 on stitch-correct rows and 0.00 on the 26% called over-merged. Zero across fifteen rows is not a coin flip; it is the signature of a question with no answer, because an over-merged row holds two or more units of work and therefore has no single true task_type. That conditioning is a diagnostic and deliberately does not move reliable — the ledger really does hold the bad label on those rows. It tells you what to fix: the stitch, not the prompt.

6. Slice the epics
node $SKILL/scripts/slice.mjs --min-chats 6        # add --dry-run --json to look first

A task with dozens of chats is the right unit of record and the wrong unit to quote: nobody is asked "how long is a 76-hour integration", they are asked "how long is the webhook part". Splitting the epic into separate task rows is exactly the under-merging that makes a ledger flatter itself, so the row never moves. Instead slice.mjs writes a view onto it — task.sub_tasks[] — grouping its chats by shared PR first, then by classifier label overlap AND time adjacency (both halves required: the same slug three weeks later is a regression, not the same slice).

A slice whose member chats all reported no unit of work is flagged no_work and dropped from the epic-slice quantiles, exactly as a no_work task row is dropped from the task quantiles and for the same reason — it sits at the bottom of every class and answers a different question. It stays in sub_tasks; only the statistics ignore it, and excluded_no_work_slices reports the count.

Every chat lands in exactly one slice, so the slices' hours and rounds sum back to the epic's own. That invariant is what makes a slice quotable rather than an impression. Run this after classify.mjs (it reads sub_deliverables) and before calibrate.mjs, which turns the slices into the epic-slice reference class.

7. Calibrate
node $SKILL/scripts/calibrate.mjs --ledger $LEDGER/ledger --out $LEDGER/calibration.json

Two kinds of row are excluded from every quantile: noise (permission probes, scratch QA sessions) and no_work: true (the classifier found no unit of work — pure Q&A, a status check, a session that only read). Both stay in tasks.ndjson; only the statistics ignore them, and calibration.json reports the counts in excluded so the exclusion is never invisible.

The no_work exclusion reverses an earlier call, on evidence. The old reasoning — "a question that took two hours of reading cost two hours" — is true about the hours and wrong about the class. These rows are 127 of 426 in this ledger, they cluster at the bottom of every class, and a reference class only forecasts if its members are the same KIND of thing. Leaving them in answered "how long does a bugfix take" with a distribution that is 30% "how long does answering a question take". Ask about a question and you get a question's number; ask about a bugfix and you should not.

Consequence for anything reading calibration.json: n_tasks is the quotable count, not the ledger size. n_tasks_in_ledger is the ledger size.

Then print: per-class n, the population priors, which classes are already past the n≥10 gate, and how many rows were excluded. That tells the user which questions the ledger can actually answer yet.

8. Offer the CLAUDE.md hook

Show templates/claude-md-snippet.md, show the exact diff, ask, and only then append it to the user's global CLAUDE.md between its <!-- task-estimator:start --> markers. If the markers are already present, replace the block instead of appending a second copy. Never edit a CLAUDE.md without showing the diff first.

Mode: record

Runs at the end of a substantive task, either because the user said "record this task" or because the CLAUDE.md snippet fired.

Run record.mjs. Do not hand-assemble a task row. Every rule below is already in it, and the two that are easy to get wrong by hand — rework merging and outcome sourcing — are exactly the two that make a ledger flatter itself:

SKILL=.claude/skills/task-estimator
# the session you are in right now:
nice -n 19 ionice -c3 node --max-old-space-size=2048 $SKILL/scripts/record.mjs \
  --session <session-uuid> --project <transcript-dir-name>
# or, when the transcript is simply the newest one in that project:
node $SKILL/scripts/record.mjs --latest --project -path-to-your-project

Useful flags: --dry-run (print the row, write nothing — always do this first), --outcome <shipped|shipped-then-reverted|abandoned|superseded|unknown>, --in-progress (the work is still open; outcome stays unknown, sourced honestly), --estimate-id <id> to force the quote it scores against, --ticket <KEY> to supply a rework join key the transcript never named, --json, --no-calibrate.

What it does, and why each step is not yours to improvise:

  1. Extract + stitch, structurally. A resumed session is the same task continuing, not a new one — stitch follows parent edges (first sessionId inside a file ≠ its filename) and never groups on elapsed time. Do not hand-split a long task by clock. The chat is upserted, so re-recording the same session is idempotent: the existing task row is replaced, never duplicated.
  2. Rework is charged to the original row. If a task row exists with the same PR or ticket and this work lands within 14 days, the rows merge and the merged row keeps the original task_id, with the merge recorded in rework_merges[]. Costs are re-derived from the chats, so files stay a set union and a sha both rows recorded counts once. Filing follow-up work as a fresh task is the single most common way a history silently reports itself as accurate.
  3. done means accepted or merged. An agent saying "done" overstates completion by roughly 7×. A commit or PR on the row sets outcome: shipped with outcome_source: "deterministic", and --outcome cannot override it — only shipped-then-reverted and abandoned survive an artifact, because those are the two verdicts an artifact cannot express. No artifact and no answer is unknown, never an optimistic default.
  4. Ask only for what cannot be mined, and ask at most a couple of things:
    • outcome, if there is no merged PR to read it from (--outcome);
    • external waits — what was dead time, and roughly how long. Everything else (rounds, spans, files touched, repos) comes from the transcript. Do not ask the user how long it took; that is exactly the self-report the ledger exists to replace.
  5. Scoring is automatic when a quote matches (estimate_id → ticket → task_desc_hash → slug → summary → sub-deliverable). It writes the ratio and the inside-band verdict per axis onto the estimate row, and stamps estimate_id onto the task row so the link is never re-guessed. If it reports "no quote matches", say so to the user — that is the loop being open, not a detail. Either the estimate was never logged (fix step 8 of estimate mode) or the slug does not match; --estimate-id links it by hand.
  6. Epics are re-sliced and calibrate.mjs re-runs automatically. One completed task is one more point in the class, and the next estimate should already reflect it. Recording a chat onto an existing epic also changes that epic's sub_tasks, so the slicing is redone in the same write — a stale slice list would feed the epic-slice class hours that no longer match the ledger.

Then read the one-paragraph summary back to the user, including what was not measured (no repo detected, no commits, outcome sourced from them rather than an artifact). Finish with score.mjs whenever a quote was scored, so the quote and its verdict land together.

Mode: recalibrate

Re-run stitch.mjs, then slice.mjs, then calibrate.mjs over the whole ledger, then run score.mjs — it computes every number below and refuses to compute the ones the ledger has not earned:

node $SKILL/scripts/slice.mjs --min-chats 6      # refresh the epic sub_deliverables first
node $SKILL/scripts/calibrate.mjs --ledger $LEDGER/ledger --out $LEDGER/calibration.json
node $SKILL/scripts/score.mjs                    # add --json for the machine-readable form

Report from its output:

  • Interval coverage — of the quotes that have actuals, what fraction landed inside the quoted P80 band? It should be ~80%. Below that the quotes are too tight; well above, too loose. score.mjs prints the binomial acceptance band at the current n beside it; quote that band and never call a miss without it. At n=1 the band is 0–100%.
  • Signed bias — the median of log(actual / quoted P50), so over- and under-estimation do not cancel, reported alongside the geometric mean ratio. Never average ratios linearly: 4× and 0.25× are the same error in opposite directions, and their arithmetic mean (2.1×) invents a bias that is not there.
  • WIS-lite decomposition at n ≥ 5 — the 80% interval score split into sharpness + over-prediction + under-prediction. Read the shares: dominated by sharpness means the bands are too wide, dominated by under-prediction means the quotes are too low. Below n = 5 it is withheld, and "withheld" is the honest report — do not substitute a number.
  • Quotes still awaiting actuals — every one is a task that finished without record mode running. Name them; that is the loop leaking.
  • Per-class n, and which classes cleared the 5 / 10 / 20 gates since last time.
  • Anything that moved: a class that just became quotable, a class whose coverage collapsed.

Recency (90-day half-life) is already inside calibrate.mjs. Do not apply a second decay on top of it.

Process hygiene — how to run these scripts on a live box

This corpus is hundreds of megabytes of transcripts on a machine that is also serving the user's own sessions. Every rule here was paid for.

  • NEVER wait on a process with pgrep, pkill -0, ps | grep or any loop built on them. pgrep -f node, pgrep -f backfill and friends match the checking process itself — the shell running the check, the subshell, the grep — so the loop observes a match forever and never exits. Two agents deadlocked on exactly this against this corpus. There is no safe flag combination; do not reach for pgrep -v $$ either.
    • To wait for something you started: run it in the foreground, or capture its PID and wait on that PID specifically (wait <pid> for a child; kill -0 <pid> for a one-shot liveness check that is not in a loop).
    • To coordinate between separate runs: use a PID file. record.mjs writes $LEDGER/ledger/.record.lock containing its own pid, refuses immediately if a live holder exists (it never polls), and takes the lock over when the recorded pid is gone. --force-lock overrides. A killed run therefore never wedges the ledger, and nothing ever scans the process table.
    • A single, non-looping ps snapshot to answer "is a backfill running right now" is fine. It is the loop that kills you, not the tool.
  • nice -n 19 ionice -c3 on anything that walks the corpus (backfill.mjs, classify.mjs, audit.mjs, record.mjs on a large transcript). The user is working on this box.
  • Bound the heap: node --max-old-space-size=2048. Individual transcripts reach 140 MB; an unbounded run will happily take the machine with it.
  • Never parallelise the extract pass. Files are processed sequentially, one big transcript at a time, on purpose.
  • Scratch goes in /tmp/claude/task-estimator*/, never in a repo and never in the ledger. Back the ledger up there before any run that rewrites it.
  • Ledger writes are atomic (temp file + rename) so a concurrent reader never sees a half-written NDJSON. Keep it that way — use writeNdjsonAtomic from lib.mjs.

Why these rules

Short version. Sources and full treatment in references/.

  • METR RCT 2025 (16 expert devs, 246 real tasks in repos they maintain) — 19% slower with AI while believing they were 20% faster; a 39-point perception gap that does not self-correct with experience, and it was largest for experts in large mature repos — exactly the conditions here. This is why self-reports are banned as calibration input and why the ledger is mined rather than asked for.
  • Done inflation ~7× — agent-declared completion overstates real completion on a maintainer-review basis, hiding ~26 minutes of remediation per "pass". Done means merged or accepted. Nothing else counts.
  • Rounds, not minutes — measured r ≈ 0.83 between human round count and total duration (0.82 in the 651-session corpus; assistant steps score higher still at 0.86), against r ≈ 0.0 for first-turn duration and only 0.53 for LOC. Per-round agent work is stable at ~9s/step and a median turn near 45s; all the variance lives in the round count.
  • 78 / 22 bimodality — 78% of high-complexity tasks finished under 25% of expected effort, while 22% of low-complexity tasks blew past 180%, driven by validation and integration rather than coding. The joint distribution is bimodal, so a single central number sits in the trough. The readiness gate is the cheapest filter on which mode a task is in: the blowups correlate with absent or untestable acceptance criteria.
  • Anchoring (Løhre & Jørgensen) — an irrelevant number moves estimates 4–5×, survives explicit instructions to ignore it, and survives an obviously unqualified source. Hence anchor-stripping happens before any reasoning, not as a caveat afterwards. Same-person re-estimates of an identical task deviate 71%, so no remembered estimate is ever data.
  • Reference-class forecasting (Kahneman/Lovallo/Flyvbjerg) — outside view first, then a bounded one-bucket inside-view shift. Software's class base rate is a 73% mean overrun with an 18% tail averaging +447%: fat-tailed, so P85 by default and P95 whenever an external dependency is in play.
  • Evidence-Based Scheduling (Spolsky) — resample whole estimate/actual ratios; never average velocity, because averaging deletes exactly the tail draws that produce the overruns. Rework is charged back to the original item — filing it separately is how a history silently reports itself as accurate.
  • Sample-size gates (Vacanti) — 5 for a median, ~11 before the observed range means anything, 10–20 before publishing an upper limit; 15 fresh points beat 150 stale ones. A personal P85 at n=11 spans 0.31–2.26× the truth, which is why everything below n≈20 is shrunk toward the population prior.
  • Empirical quantiles, not fits — a fitted lognormal lands at ×0.72 of the true median and ×1.72 at p95, while raw empirical quantiles scored leave-one-out coverage of 49.9 / 79.8 / 89.9 against nominal 50 / 80 / 90 — essentially exact. Sort the actuals and read the quantile off the data, in log space.
  • Only 35% of tasks land within 2× of the median. At that dispersion a point estimate is indefensible; the interval is the answer.
  • The constraint moved downstream — task throughput +33.7% alongside review time +441%, pickup +156%, churn +861%, and 38% of agentic PR failures are "never reviewed". An estimate that stops at "code written" measures the part that got faster. And with coding only ~30–40% of a developer's calendar time, any claimed end-to-end gain above ~40% is a measurement error, not a result.