About test-first

test-first is a TDD skill for agents that requires a failing test before production code. It guides work through narrow test–implementation cycles at agreed public seams, followed by a scoped task gate.

Key features

  1. 01Failing test before production code
  2. 02Vertical-slice test and implementation loop
  3. 03Tests at agreed public seams
  4. 04Scoped task gate and final checks
  5. 05Requirement linkage kept in docs

Use cases

  1. 01Adding behavior with test-first cycles
  2. 02Fixing a bug by reproducing it first
  3. 03Checking changed units and dependents before completion

Install

Copy the command and run it in a terminal.

$npx skills add https://github.com/jayden-dang/skills --skill test-first

After installing, type/test-firstin Claude Code to confirm it loaded.

Bundled fileseval.jsonTESTS.md

Details

From the project README

TDD

The Iron Law

NO PRODUCTION CODE WITHOUT A FAILING TEST FIRST

Wrote implementation before the test? Delete it. Not "keep it as reference", not "adapt it while the tests catch up" — you will end up testing what you built instead of what was required. Delete means delete; implement again from the test. Violating the letter of this law is violating the spirit of it.

Exceptions exist only with the user's explicit permission: throwaway run-spikes, generated code, pure configuration. "Skip it just this once" is not an exception; it is the rationalization this skill exists to block.

Where tests go: pre-agreed seams

A seam is a public surface where behavior is observable without reaching into internals. Tests live only at seams listed in the feature's design.md under Seams for testing. Refuse to write a test at a seam that table does not confirm. No design.md for this work (tier 0/1 change, legacy area)? Propose the seam(s) to the user and get agreement before the first test. Testing effort is a budget — agreed seams put it on critical paths instead of on every internal detail.

The loop

Work one vertical slice at a time: one behavior → one test → one minimal implementation → repeat. Each cycle responds to what the previous one taught you. Never write all the tests up front and then all the code — bulk-written tests prove-claim imagined behavior.

RED — write one failing test. One behavior, a name that states the behavior in domain language, expectations against real code at an agreed seam. Do not require embedding a requirement ID in application or test source (docs-only spine). Map the test to its requirement ID in the task report / Spec review. Fixing a bug? REQUIRED SUB-SKILL: use root-cause to establish the root cause first — the RED test must reproduce that bug, failing for the bug's reason, before any fix.

Verify RED — mandatory, never skip. Run the test (single-file command from docs/agents/project.md). Confirm it fails, that the failure message is the one you expected, and that it fails because the behavior is missing — not because of a typo or import error. Test passes immediately? You are testing behavior that already exists — fix the test, not the code. Test errors instead of failing? Fix the error and re-run until it fails correctly.

GREEN — write the simplest code that passes. No speculative parameters, no extra features, no touching unrelated code.

Verify GREEN — mandatory. Run the narrowest command that builds and runs the new test's target (the single-file pattern). Confirm: the new test passes, every other test in that run still passes, and the output is pristine — zero warnings, zero stray errors, nothing you're "planning to clean up". New test fails? Fix the code, never loosen the test. Other tests fail? Fix now, before anything else.

REFACTOR — only while green. Remove duplication, improve names, extract helpers. Re-run that same command after each change. Add no behavior.

Then take the next slice.

The task gate — once, before you claim the work done

Each step above stays narrow; breadth is paid once, at the final commit:

  1. Tests of every unit you changed plus every unit that depends on it — the project's Task gate command, else derive it from the build graph (changed packages and their reverse dependencies).
  2. Lint and format over the same units, against the lint baseline recorded at session start. A finding absent from the baseline is yours. Never suppress a lint rule to get past a red baseline.
  3. Escalate to the whole suite when the change reaches what the build graph cannot see: schema or migrations, shared fixtures or test data, build manifests or feature flags, generated contracts, a root package nearly everything depends on. You judge it and name the reason.

When the whole suite is cheap (a couple of minutes), it is the gate — run it. Report the scope you ran: Task gate: <commands> — covering <units>, or Whole suite: <command> — escalated: <reason>. A gate run is never quoted as the suite; the whole suite runs at close.

Requirement linkage (docs-only)

Requirement IDs live in docs/specs/** (requirements.md, design Satisfies:, task _Requirements: footers). Tests prove behavior in domain language.

  • Do not require /// REQ:, @CODE-N.M, or IDs in test titles for consumer application code. Legacy annotations are ignored by audit-trace.
  • Do ensure each new behavior maps to a requirement in the task brief; if no requirement covers it, surface the gap (tier ≥1) rather than inventing scope.
  • Exception: this skill-set repository's own pack tests may embed greppable CODE-N.M tokens as product fixtures testing the pack — that is not a consumer convention.

If docs/agents/project.md is missing, say so and suggest configure-repo; still write domain-named tests at agreed seams.

Testing standards doc (optional)

Applicability: seams, mock boundaries, or suite commands. Load: skills/project/define-system-doc/consult-recipe.md. Path: docs/standards/testing.md (pack SSOT counts as present standing rules). Apply when present in addition to this skill's Iron Law (Iron Law never weakens). No-op when absent; suggest once /define-system-doc standards/testing only if material; never auto-invoke.

Anti-patterns and their counters

Anti-patternTellCounter
Tautological testExpected value is recomputed the same way the code computes it (expect(sum(items)).toBe(items.reduce(...))), so it passes by constructionExpected values come from an independent source of truth: a known-good literal, a worked example, the requirement text
Implementation-coupled testBreaks on refactor with no behavior change; asserts call counts/order, private methods, or verifies through a side channel (raw DB query instead of the interface)Assert observable behavior through the public seam only
Testing mock behaviorAssertion checks the mock exists or was called; test fails when the mock is removedTest the real component, or stop asserting on the mock entirely
Test-only methods on production classesA method (e.g. destroy()) called only from test filesMove it to a test utility; production classes carry production API only
Incomplete mocksMock carries only the fields this test happens to read; integration breaks on omitted fieldsMirror the complete real data structure — every field the real response contains
Mocking your own modulesInternal collaborators stubbed out "to isolate"Mock only at system boundaries (external APIs, time, randomness, sometimes FS/DB). Never mock code you own — if that seems necessary, the design is too coupled: inject dependencies instead

Mock setup longer than the test logic, or a test that fails when a mock is removed, means the mock is the problem — prefer an integration test through real components.

Rationalizations

ThoughtReality
"Too simple to test"Simple code breaks too; the test costs a minute
"I'll add tests right after"A test written after passes immediately and proves nothing — you never saw it catch anything
"Tests-after achieve the same thing in spirit"Tests-after answer "what does this do?"; tests-first answer "what should this do?" — the first is biased by your implementation
"I already exercised it manually"Ad-hoc, unrecorded, unrepeatable. It vanishes on the next change
"Deleting hours of work is wasteful"Sunk cost. Untested code you keep is the actual waste
"Keep it as reference while I write tests"That is testing after, with extra steps
"The test is hard to write"Hard to test means hard to use — simplify the interface, don't skip the test
"TDD slows me down"Slower than typing, faster than debugging
"This file has no tests anyway"You're changing it; your change gets a test
"Run the whole suite on every GREEN to be safe"Six 18-minute runs per task buys nothing the task gate and the close run don't. Narrow each step; gate once
"The scoped run passed — tests pass"Name the scope you ran. "Tests pass" is the whole suite's claim
"Lint was already red, so allow the rule / it can't be checked"Compare against the baseline. Suppressing the rule hides your findings with the old one
"It's only a migration file, the crate tests cover it"Every test reads that schema. Escalate

Red flags — stop and start over

  • Implementation exists and its test doesn't
  • A new test passed on its first run
  • You can't say why the test failed in RED
  • A test targets a seam not in the design's seam table
  • A new behavior has no mapping to a requirement in the brief (tier ≥1)
  • "Just this once", "keep as reference", "spirit not ritual", "this case is different"

Any of these: delete the untested code, return to RED.

Before claiming done

  • Every new behavior has a test you watched fail first, for the expected reason — error paths and boundary values count as behaviors
  • Task gate green at the final commit with its scope named — or the whole suite, with the escalation reason — output pristine, no lint finding outside the baseline
  • Each new behavior maps to a requirement in the task brief / report (IDs stay in docs, not required in test source)
  • All tests sit at seams agreed in design.md (or agreed with the user)
  • Mocks only at system boundaries, complete data structures, no assertions on mocks

Can't tick a box? The work isn't done. REQUIRED SUB-SKILL: use prove-claim before any completion claim.