write-handoff is a skill for agents handing off unfinished work. It prioritizes checkable repository state, the next action, authoritative documents, and hard-to-rediscover pitfalls so a new session can resume efficiently.

Key features

  1. 01Record branch, checkout, and push status
  2. 02State the first action for resuming
  3. 03Link authoritative plans and decision records
  4. 04Capture traps, open questions, and deferred work
  5. 05Update and commit HANDOFF.md as specified

Use cases

  1. 01Pausing a task before its scope is complete
  2. 02Transferring unfinished work to another agent
  3. 03Moving work to another branch, machine, or session

Install

Copy the command and run it in a terminal.

$npx skills add https://github.com/koruworks/skills --skill write-handoff

After installing, type/write-handoffin Claude Code to confirm it loaded.

Details

From the project README

Hand the work to the next agent

Work is stopping with something still owed, and the session that knows why is about to disappear. The next agent starts cold: no conversation, no reasoning, only the tree and whatever you leave behind. docs/<feature>/HANDOFF.md (in the project's planning folder, unless it uses another) is what you leave behind.

You are judged on whether that agent's first hour is productive rather than archaeological — whether it knows where the work is, what to do first, and which of the things it is about to discover are already understood.

This is not write-acceptance. That one hands finished work to a person to test and accept. This one hands unfinished work to an agent. Different reader, different question — a run that both finished a phase and left one owed writes both.

When to write one

  • The requested scope is not complete: phases deferred, blocked on a decision, or stopped for the day.
  • Your context is running out mid-task.
  • The work moves to another branch, checkout, machine, or person's session.

Do not write one when the scope is done. Finished work is described by EXECUTION.md and retired by close-plan or close-roadmap; a handoff for it is a fourth summary of the same run that will go stale and be believed anyway.

What goes in it

Start with the state of the tree, because that is what goes wrong first. Name the branch and the checkout (or worktree) path, whether the working tree is clean, and what has and has not been pushed — an agent that assumes origin has the work will act on a branch that does not exist. Then the first action: if the main integration branch (e.g. main or dev) has moved, say "merge <main> before anything else touches the tree", and say it before anything else on the page.

  • Where to resume, first and unmissable. One sentence naming the next thing to do. Everything else on the page is context for it.
  • What was built — as pointers, not a retelling. Name the documents that are authoritative (the final plan, the decision records, the generated reference) and say plainly that the summary is not the specification. A prose recap becomes a second, wrong copy of the plan the moment anything changes.
  • The commit list, only where it explains something. EXECUTION.md already holds what landed with hashes — link it rather than restating the table. What belongs here is the commit whose shape is surprising: the one that renumbered the decision records, the one that is merge-only, the one still exclusive to this branch.
  • The traps. The conflict that will recur and the rule that settled it last time, the test that fails at the branch base and is not yours, the flake and its tell, the thing that looks broken and is not. This is the part that cannot be recovered from the tree, so it is the part with the most value per line — a trap you name once is a trap the next agent does not pay for.
  • The decisions taken while the user was away, with a pointer to the questions log (wherever the project keeps open questions; if it has no convention, a questions section or file beside the plan). The next agent must not silently re-decide them, and must know which are still open.
  • What is deliberately not done, so the next agent extends the work rather than "fixing" an intentional gap.

Date it and name the session's scope in the opening line — "written at the end of the run that built Milestone 1". A handoff is true as of a moment; an undated one is trusted long after it stops being right.

How to write it

  • Assume the reader has read the project's agent orientation (an AGENTS.md, CONTRIBUTING.md or similar) and nothing else. Say so, and point at it. Do not restate the repo's standing rules; do point at the area docs for the code this work touches.
  • Be concrete about paths, branches and commands. "The worktree" is not an address; ../myapp-wt/spell-check on branch spell-check/p4 is.
  • Prefer the fact that is expensive to rediscover. Anything an agent can learn in one git log or one grep does not need a paragraph. Anything that took you an hour to work out needs one.
  • Keep it short enough to be read in full before work starts. A handoff nobody finishes hands off nothing.

Where it sits

  • Write it to docs/<feature>/HANDOFF.md and commit it as the last commit of the run, so it describes the tree the next agent actually clones.
  • Update it in place rather than appending a second one; a stale handoff beside a current one is worse than neither.
  • resume-handoff is the reader. It checks every claim against the tree before trusting it, so write the checkable facts in a checkable form — commit hashes, ahead/behind counts, the checkout path, the names of the tests that are red on the parent — and never lean on a private memory or note the next session may not have. Once the user has agreed the direction, it deletes the page: a handoff is consumed, not maintained, and the session that consumed it writes the next one from its own tree.
  • close-plan or close-roadmap retires it when the feature's docs are closed out.