mcpField
B
biz-lean-six-sigma

biz-lean-six-sigma

github.com/asgard-ai-platform其他24368 次安装21 周前更新
代码仓库

关于 biz-lean-six-sigma

结合 Lean 消除浪费与 Six Sigma 控制波动的流程改进技能。它依据客户价值和流程数据,引导团队识别浪费、开展 DMAIC 分析并持续改进。

主要功能

  1. 01识别 TIMWOOD 浪费
  2. 02DMAIC 改进循环
  3. 03根因分析方法
  4. 04Kaizen 持续改进
  5. 05流程分析模板

适用场景

  1. 01发现内部流程中的浪费
  2. 02调查缺陷或周期过长问题
  3. 03规划基于数据的流程改进

安装

复制下面的命令,在终端中运行。

$npx skills add https://github.com/asgard-ai-platform/skills --skill biz-lean-six-sigma

安装后在 Claude Code 中输入/biz-lean-six-sigma确认已加载。

包含的文件

除 SKILL.md 外,安装时一起下载的参考资料和脚本。

examples/
sample_scenario.md
references/
spc-basics.md
value-stream-mapping.md

详细介绍

精益六西格玛

概述

精益旨在消除浪费(不增值的活动)。六西格玛旨在减少变异(缺陷和不一致)。二者结合,可提升速度和质量。精益关注“我们是否在做不必要的事?”,六西格玛关注“我们是否始终如一地做好必要的事?”

框架

IRON LAW: Value Is Defined by the CUSTOMER, Not the Producer

An activity adds value ONLY if: (1) the customer is willing to pay for it,
(2) it transforms the product/service, AND (3) it's done right the first time.
If any condition fails, the activity is waste — eliminate or minimize it.
七大浪费(TIMWOOD)
浪费定义示例
Transportation不必要的物料移动在仓库之间搬运库存
Inventory超出即时需求的过量库存6 个月用量的原材料闲置堆放
Motion人员不必要的移动为拿工具而穿过整个工厂车间
Waiting流程步骤之间的闲置时间订单等待审批
Over-production生产超出所需的数量打印 1000 份报告,但只有 100 份会被阅读
Over-processing完成超出客户要求的工作对一份非关键表格进行三重检查
Defects需要返工或处置的产出软件缺陷、制造不合格品
DMAIC 改进循环(六西格玛)
  1. Define(定义):问题是什么?客户是谁?目标指标是什么?
  2. Measure(测量):当前绩效如何?收集缺陷率、周期时间和变异方面的数据。
  3. Analyze(分析):问题由什么引起?使用根因分析(5 个为什么、鱼骨图、帕累托图)。
  4. Improve(改进):哪些变更可以解决问题?设计并测试解决方案。
  5. Control(控制):如何维持改进成果?实施监控、标准操作规程和控制图。
Kaizen(持续改进)

由一线员工持续进行的小幅渐进式改进:

  • 每日站会,找出一项改进
  • 如果可行,立即实施
  • 记录并在各团队间分享

输出格式

# Lean Six Sigma Analysis: {Process}

## Current State
- Process: {description}
- Key metric: {defect rate / cycle time / cost}
- Current performance: {baseline data}

## Waste Identification (TIMWOOD)
| Waste Type | Found? | Description | Impact |
|-----------|--------|-------------|--------|
| Transportation | Y/N | {detail} | H/M/L |
| Inventory | Y/N | ... | ... |
| Motion | Y/N | ... | ... |
| Waiting | Y/N | ... | ... |
| Over-production | Y/N | ... | ... |
| Over-processing | Y/N | ... | ... |
| Defects | Y/N | ... | ... |

## Root Cause Analysis
{5 Whys or fishbone diagram for top waste}

## Improvement Plan (DMAIC)
| Phase | Action | Owner | Timeline |
|-------|--------|-------|----------|
| Define | {problem statement} | ... | ... |
| Measure | {data collection plan} | ... | ... |
| Analyze | {root cause method} | ... | ... |
| Improve | {solution} | ... | ... |
| Control | {monitoring plan} | ... | ... |

## Expected Impact
- {metric}: {current} → {target} ({X% improvement})

示例

正确应用

场景: 对餐厅厨房的订单流程进行精益分析

  • 等待浪费:订单等待 8 分钟,由传菜员集中分批处理 → 改用实时工单系统(每份订单节省 6 分钟)
  • 动作浪费:厨师每处理一份订单,都要走 15 米到冷藏区 → 将备餐区冰箱移至附近(节省 2 分钟)
  • 缺陷浪费:订单错误率为 12% → 实施带可视化确认功能的厨房显示系统(目标为 3%)
  • 根因分析(5 个为什么):错误 → 手写工单 → 字迹潦草 → 缺少标准格式 → 没有数字化点餐系统
错误应用
  • 将“市场正在萎缩”认定为一种浪费 → 市场状况属于外部因素,并非流程浪费。TIMWOOD 仅适用于内部流程。

注意事项

  • 第八种浪费——未充分利用人才:常被加入 TIMWOOD。员工的想法未被倾听,或技能未被利用。
  • 精益可能走得太远:消除所有库存(零缓冲)会导致脆弱性。有些“浪费”其实是战略缓冲。应在效率与韧性之间取得平衡。
  • 六西格玛需要数据:没有基线测量,就无法计算改进幅度。在着手寻找解决方案之前,应先投入资源进行测量。
  • 文化阻力:精益/六西格玛需要一线员工的支持。不让员工参与的自上而下指令会以失败告终。

参考资料

  • 有关价值流图方法,请参阅 references/value-stream-mapping.md
  • 有关统计过程控制(SPC),请参阅 references/spc-basics.md

评论

支持 Markdown