Schedule-Cost Linker 是用于项目控制的技能,可将进度活动与成本数据关联,支持成本加载进度、现金流预测和挣值分析。

主要功能

  1. 01关联活动与预算项
  2. 02创建成本加载进度
  3. 03预测现金流
  4. 04计算挣值指标
  5. 05查看月度现金流

适用场景

  1. 01分析 CPI、SPI 和 EAC
  2. 02预测项目现金流
  3. 03按月查看现金流

安装

复制下面的命令,在终端中运行。

$npx skills add https://github.com/datadrivenconstruction/ddc_skills_for_ai_agents_in_construction --skill schedule-cost-link

安装后在 Claude Code 中输入/schedule-cost-link确认已加载。

附带文件claw.jsoninstructions.md

详细介绍

进度-成本链接器

商业案例

问题陈述

集成进度与成本需要:

  • 将活动关联到预算项
  • 创建加载成本的进度计划
  • 生成现金流预测
  • 跟踪挣值指标
解决方案

系统化地将进度活动与成本数据关联起来,实现集成项目控制。

技术实现

import pandas as pd
import numpy as np
from typing import Dict, Any, List, Optional, Tuple
from dataclasses import dataclass, field
from datetime import date, timedelta
from enum import Enum
from collections import defaultdict


class LoadingMethod(Enum):
    UNIFORM = "uniform"          # Even distribution
    FRONT_LOADED = "front_loaded"
    BACK_LOADED = "back_loaded"
    BELL_CURVE = "bell_curve"


@dataclass
class ScheduleActivity:
    activity_id: str
    name: str
    start_date: date
    finish_date: date
    duration: int
    percent_complete: float = 0


@dataclass
class CostItem:
    cost_code: str
    description: str
    budgeted_cost: float
    labor_cost: float
    material_cost: float
    equipment_cost: float


@dataclass
class ActivityCostLink:
    activity_id: str
    cost_code: str
    budgeted_cost: float
    loading_method: LoadingMethod


@dataclass
class EarnedValueMetrics:
    data_date: date
    bcws: float  # Budgeted Cost of Work Scheduled (PV)
    bcwp: float  # Budgeted Cost of Work Performed (EV)
    acwp: float  # Actual Cost of Work Performed (AC)
    sv: float    # Schedule Variance
    cv: float    # Cost Variance
    spi: float   # Schedule Performance Index
    cpi: float   # Cost Performance Index
    eac: float   # Estimate at Completion
    etc: float   # Estimate to Complete
    vac: float   # Variance at Completion


class ScheduleCostLinker:
    """Link schedule activities to cost items."""

    def __init__(self, project_name: str, budget_at_completion: float):
        self.project_name = project_name
        self.bac = budget_at_completion
        self.activities: Dict[str, ScheduleActivity] = {}
        self.cost_items: Dict[str, CostItem] = {}
        self.links: List[ActivityCostLink] = []
        self.actual_costs: Dict[str, float] = {}  # activity_id -> actual cost

    def add_activity(self,
                     activity_id: str,
                     name: str,
                     start_date: date,
                     finish_date: date,
                     percent_complete: float = 0):
        """Add schedule activity."""

        duration = (finish_date - start_date).days + 1

        self.activities[activity_id] = ScheduleActivity(
            activity_id=activity_id,
            name=name,
            start_date=start_date,
            finish_date=finish_date,
            duration=duration,
            percent_complete=percent_complete
        )

    def add_cost_item(self,
                      cost_code: str,
                      description: str,
                      budgeted_cost: float,
                      labor_pct: float = 0.4,
                      material_pct: float = 0.5,
                      equipment_pct: float = 0.1):
        """Add cost item."""

        self.cost_items[cost_code] = CostItem(
            cost_code=cost_code,
            description=description,
            budgeted_cost=budgeted_cost,
            labor_cost=budgeted_cost * labor_pct,
            material_cost=budgeted_cost * material_pct,
            equipment_cost=budgeted_cost * equipment_pct
        )

    def link_activity_cost(self,
                           activity_id: str,
                           cost_code: str,
                           loading_method: LoadingMethod = LoadingMethod.UNIFORM):
        """Link activity to cost item."""

        if activity_id not in self.activities:
            return

        cost_item = self.cost_items.get(cost_code)
        budgeted = cost_item.budgeted_cost if cost_item else 0

        self.links.append(ActivityCostLink(
            activity_id=activity_id,
            cost_code=cost_code,
            budgeted_cost=budgeted,
            loading_method=loading_method
        ))

    def record_actual_cost(self, activity_id: str, actual_cost: float):
        """Record actual cost for activity."""
        self.actual_costs[activity_id] = actual_cost

    def _distribute_cost(self,
                          cost: float,
                          start_date: date,
                          duration: int,
                          method: LoadingMethod) -> Dict[date, float]:
        """Distribute cost over activity duration."""

        daily_costs = {}

        if duration <= 0:
            return {start_date: cost}

        if method == LoadingMethod.UNIFORM:
            daily = cost / duration
            for i in range(duration):
                daily_costs[start_date + timedelta(days=i)] = daily

        elif method == LoadingMethod.FRONT_LOADED:
            total_weight = sum(range(duration, 0, -1))
            for i in range(duration):
                weight = (duration - i) / total_weight
                daily_costs[start_date + timedelta(days=i)] = cost * weight

        elif method == LoadingMethod.BACK_LOADED:
            total_weight = sum(range(1, duration + 1))
            for i in range(duration):
                weight = (i + 1) / total_weight
                daily_costs[start_date + timedelta(days=i)] = cost * weight

        elif method == LoadingMethod.BELL_CURVE:
            # Simplified bell curve
            mid = duration / 2
            for i in range(duration):
                distance = abs(i - mid)
                weight = 1 - (distance / mid) * 0.5
                daily_costs[start_date + timedelta(days=i)] = cost * weight / duration

        return daily_costs

    def generate_cost_loaded_schedule(self) -> pd.DataFrame:
        """Generate cost-loaded schedule."""

        data = []

        for link in self.links:
            activity = self.activities.get(link.activity_id)
            cost_item = self.cost_items.get(link.cost_code)

            if activity and cost_item:
                data.append({
                    'Activity ID': activity.activity_id,
                    'Activity Name': activity.name,
                    'Cost Code': link.cost_code,
                    'Description': cost_item.description,
                    'Start': activity.start_date,
                    'Finish': activity.finish_date,
                    'Duration': activity.duration,
                    'Budget': link.budgeted_cost,
                    '% Complete': activity.percent_complete,
                    'Earned Value': link.budgeted_cost * activity.percent_complete / 100,
                    'Loading': link.loading_method.value
                })

        return pd.DataFrame(data)

    def generate_cash_flow(self,
                           project_start: date = None,
                           project_end: date = None) -> pd.DataFrame:
        """Generate cash flow curve."""

        if not self.links:
            return pd.DataFrame()

        # Get date range
        if project_start is None:
            project_start = min(self.activities[l.activity_id].start_date for l in self.links)
        if project_end is None:
            project_end = max(self.activities[l.activity_id].finish_date for l in self.links)

        # Aggregate daily costs
        daily_totals = defaultdict(float)

        for link in self.links:
            activity = self.activities.get(link.activity_id)
            if not activity:
                continue

            daily_costs = self._distribute_cost(
                link.budgeted_cost,
                activity.start_date,
                activity.duration,
                link.loading_method
            )

            for day, cost in daily_costs.items():
                daily_totals[day] += cost

        # Build cash flow data
        data = []
        cumulative = 0
        current = project_start

        while current <= project_end:
            daily = daily_totals.get(current, 0)
            cumulative += daily

            data.append({
                'Date': current,
                'Daily': round(daily, 2),
                'Cumulative': round(cumulative, 2),
                'Cumulative %': round(cumulative / self.bac * 100, 1) if self.bac > 0 else 0
            })

            current += timedelta(days=1)

        return pd.DataFrame(data)

    def calculate_earned_value(self, data_date: date) -> EarnedValueMetrics:
        """Calculate earned value metrics at data date."""

        # BCWS - Planned Value through data date
        bcws = 0
        for link in self.links:
            activity = self.activities.get(link.activity_id)
            if not activity:
                continue

            daily_costs = self._distribute_cost(
                link.budgeted_cost,
                activity.start_date,
                activity.duration,
                link.loading_method
            )

            for day, cost in daily_costs.items():
                if day <= data_date:
                    bcws += cost

        # BCWP - Earned Value (budget * % complete)
        bcwp = 0
        for link in self.links:
            activity = self.activities.get(link.activity_id)
            if activity:
                bcwp += link.budgeted_cost * activity.percent_complete / 100

        # ACWP - Actual Cost
        acwp = sum(self.actual_costs.values())

        # Variances
        sv = bcwp - bcws
        cv = bcwp - acwp

        # Indices
        spi = bcwp / bcws if bcws > 0 else 0
        cpi = bcwp / acwp if acwp > 0 else 0

        # Forecasts
        eac = self.bac / cpi if cpi > 0 else self.bac
        etc = eac - acwp
        vac = self.bac - eac

        return EarnedValueMetrics(
            data_date=data_date,
            bcws=round(bcws, 2),
            bcwp=round(bcwp, 2),
            acwp=round(acwp, 2),
            sv=round(sv, 2),
            cv=round(cv, 2),
            spi=round(spi, 2),
            cpi=round(cpi, 2),
            eac=round(eac, 2),
            etc=round(etc, 2),
            vac=round(vac, 2)
        )

    def get_monthly_cash_flow(self) -> pd.DataFrame:
        """Aggregate cash flow by month."""

        daily = self.generate_cash_flow()
        if daily.empty:
            return pd.DataFrame()

        daily['Month'] = pd.to_datetime(daily['Date']).dt.to_period('M')
        monthly = daily.groupby('Month').agg({
            'Daily': 'sum',
            'Cumulative': 'last'
        }).reset_index()

        monthly.columns = ['Month', 'Monthly Cost', 'Cumulative']
        return monthly

    def export_to_excel(self, output_path: str) -> str:
        """Export integrated data to Excel."""

        with pd.ExcelWriter(output_path, engine='openpyxl') as writer:
            # Cost-loaded schedule
            schedule = self.generate_cost_loaded_schedule()
            schedule.to_excel(writer, sheet_name='Cost-Loaded Schedule', index=False)

            # Cash flow
            cash_flow = self.generate_cash_flow()
            if not cash_flow.empty:
                cash_flow.to_excel(writer, sheet_name='Cash Flow', index=False)

            # Monthly
            monthly = self.get_monthly_cash_flow()
            if not monthly.empty:
                monthly.to_excel(writer, sheet_name='Monthly', index=False)

            # Earned Value
            evm = self.calculate_earned_value(date.today())
            evm_df = pd.DataFrame([{
                'Data Date': evm.data_date,
                'BCWS (PV)': evm.bcws,
                'BCWP (EV)': evm.bcwp,
                'ACWP (AC)': evm.acwp,
                'SV': evm.sv,
                'CV': evm.cv,
                'SPI': evm.spi,
                'CPI': evm.cpi,
                'EAC': evm.eac,
                'ETC': evm.etc,
                'VAC': evm.vac
            }])
            evm_df.to_excel(writer, sheet_name='Earned Value', index=False)

        return output_path

快速开始

from datetime import date, timedelta

# Initialize linker
linker = ScheduleCostLinker("Office Building", budget_at_completion=5000000)

# Add activities
linker.add_activity("A-001", "Foundation", date(2024, 6, 1), date(2024, 6, 30), percent_complete=100)
linker.add_activity("A-002", "Structure", date(2024, 7, 1), date(2024, 9, 30), percent_complete=60)
linker.add_activity("A-003", "MEP", date(2024, 8, 1), date(2024, 11, 30), percent_complete=30)

# Add cost items
linker.add_cost_item("01-FOUND", "Foundation Work", 500000)
linker.add_cost_item("02-STRUCT", "Structural Work", 2000000)
linker.add_cost_item("03-MEP", "MEP Systems", 1500000)

# Link
linker.link_activity_cost("A-001", "01-FOUND")
linker.link_activity_cost("A-002", "02-STRUCT", LoadingMethod.BELL_CURVE)
linker.link_activity_cost("A-003", "03-MEP", LoadingMethod.BACK_LOADED)

# Record actuals
linker.record_actual_cost("A-001", 520000)
linker.record_actual_cost("A-002", 1300000)

常见用例

1. 挣值分析
evm = linker.calculate_earned_value(date.today())
print(f"CPI: {evm.cpi}")
print(f"SPI: {evm.spi}")
print(f"EAC: ${evm.eac:,.2f}")
2. 现金流预测
cash_flow = linker.generate_cash_flow()
print(cash_flow.tail(10))
3. 月度分解
monthly = linker.get_monthly_cash_flow()
print(monthly)

资源

  • DDC Book:第 4.2 章 - 进度-成本集成

评论